E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />JUAN H. VAZQUEZ, P.E., P.H., BCEE
<br /> 13. ROLE IN THIS CONTRACT
<br />Hydrology/Drainage
<br /> 14. YEARS EXPERIENCE a. TOTAL35
<br /> b. WITH CURRENT FIRM20
<br />15. FIRM NAME AND LOCATION (City and State)R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />16. EDUCATION (Degree and Specialization)B.S., Civil Engineering, University of Puerto Rico/1985
<br />Professional Hydrologist – License No. 05-H-1653Board Certified Environmental Engineer 07-20009/2007
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />P.E. No. 51143 Florida/1996
<br />P.E. No. 0402 025604 Virginia/1994
<br />P.E. No. 11385 Puerto Rico/1989
<br />P.E. No. 46482 Michigan/1999
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)Mr. Vazquez is a member of the American Society of Civil Engineers, Association of Engineers and Land Surveyors of Puerto Rico, American
<br />Society of Highway Engineers, American Public Works Association, American Institute of Hydrology, Florida Institute of Consulting Engineers
<br />Water Resources Committee Member, and American Academy of Environmental Engineers. For the 6th year in a row, He is in the “Who’s Who
<br />book of Environmental Engineering, 2019”. He is Board Certified Environmental Engineer with specialty in Water Supply and Wastewater.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)Tressler Street Drainage Improvements - City of North Miami, Florida (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Manager/QC Assurance for this project. The improvements included upgrading existing drainage infrastructure by installing exfiltration
<br />trenches, solid piping, installation of new catch basin structures with baffles, regrading of swale areas, replacement of existing hand built catch
<br />basins, swale retrofit, and other Best Management Practices (BMPs) along Tressler Street including pervious pavements for swale reconstruction.
<br />Also included estimates, utility coordination, permitting and bid assistance. Cost/Fees Paid: $90,949; Construction Cost: $1,100,000 (Estimated)
<br />b.
<br />(1) TITLE AND LOCATION (City and State)NW 87th Avenue, Miami-Dade County, Florida – FDOT, District 6 (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmEngineer of Record for drainage and preparation of the NW 87th Avenue Bridge Hydraulic Report. Project length: 2 miles; FM#: 405615-3-52-01
<br />Cost/Fees Paid: $2,994,823.00 – Construction Cost: $34,800,000.00 (Estimated).
<br />c
<br />(1) TITLE AND LOCATION (City and State)MS4 NPDES Stormwater Assessment Program, City of Hialeah, Florida (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Manager for the preparation of the stormwater assessment program, as required by the Municipal Separate Storm Sewer System Permit
<br />that was issued June 30, 2016. This permit covers all areas located within the political boundary of the City of Hialeah that is served by the MS4
<br />owned or operated by the City. The purpose of this assessment program is to provide information for the City of Hialeah to determine the overall
<br />effectiveness of its Stormwater Management Program (SWMP) in reducing stormwater pollutant loadings from its Municipal Separate Storm
<br />Sewer System (MS4) to receiving water bodies. Cost/Fees Paid: $9,772; Construction Cost: N/A
<br />d.
<br />(1) TITLE AND LOCATION (City and State)43-year CDBG improvements, NW 2nd Avenue from NW 4th Street to NW 5th Street -City of Hallandale Beach, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmEngineer of Record for the drainage design of City streets improvements. These improvements will upgrade physical/aesthetic appearance that
<br />will complement housing development and rehabilitation as well as promote more attractive neighborhoods. In general, the improvements include
<br />sidewalk replacement, minor drainage improvements, milling and resurfacing, new ADA compliant ramps and sodding.
<br />Cost/Fees Paid: $28,155 – Construction Cost: $87,000.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)Lakeshore and River Run Park Improvements – City of Miramar, Florida (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Manager and EOR for master planning and civil design of the improvements. Improvements included building modifications, additional
<br />parking, new lighting, grading and drainage and reconfiguration of existing parking, and park appurtenances such as benches, trash collectors,
<br />new fountains and playgrounds. Cost/Fees Paid: $118,604.64 – Construction Cost: $700,000.00.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
|