Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />JUAN H. VAZQUEZ, P.E., P.H., BCEE <br /> 13. ROLE IN THIS CONTRACT <br />Hydrology/Drainage <br /> 14. YEARS EXPERIENCE a. TOTAL35 <br /> b. WITH CURRENT FIRM20 <br />15. FIRM NAME AND LOCATION (City and State)R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (Degree and Specialization)B.S., Civil Engineering, University of Puerto Rico/1985 <br />Professional Hydrologist – License No. 05-H-1653Board Certified Environmental Engineer 07-20009/2007 <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />P.E. No. 51143 Florida/1996 <br />P.E. No. 0402 025604 Virginia/1994 <br />P.E. No. 11385 Puerto Rico/1989 <br />P.E. No. 46482 Michigan/1999 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)Mr. Vazquez is a member of the American Society of Civil Engineers, Association of Engineers and Land Surveyors of Puerto Rico, American <br />Society of Highway Engineers, American Public Works Association, American Institute of Hydrology, Florida Institute of Consulting Engineers <br />Water Resources Committee Member, and American Academy of Environmental Engineers. For the 6th year in a row, He is in the “Who’s Who <br />book of Environmental Engineering, 2019”. He is Board Certified Environmental Engineer with specialty in Water Supply and Wastewater. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State)Tressler Street Drainage Improvements - City of North Miami, Florida (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Manager/QC Assurance for this project. The improvements included upgrading existing drainage infrastructure by installing exfiltration <br />trenches, solid piping, installation of new catch basin structures with baffles, regrading of swale areas, replacement of existing hand built catch <br />basins, swale retrofit, and other Best Management Practices (BMPs) along Tressler Street including pervious pavements for swale reconstruction. <br />Also included estimates, utility coordination, permitting and bid assistance. Cost/Fees Paid: $90,949; Construction Cost: $1,100,000 (Estimated) <br />b. <br />(1) TITLE AND LOCATION (City and State)NW 87th Avenue, Miami-Dade County, Florida – FDOT, District 6 (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmEngineer of Record for drainage and preparation of the NW 87th Avenue Bridge Hydraulic Report. Project length: 2 miles; FM#: 405615-3-52-01 <br />Cost/Fees Paid: $2,994,823.00 – Construction Cost: $34,800,000.00 (Estimated). <br />c <br />(1) TITLE AND LOCATION (City and State)MS4 NPDES Stormwater Assessment Program, City of Hialeah, Florida (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Manager for the preparation of the stormwater assessment program, as required by the Municipal Separate Storm Sewer System Permit <br />that was issued June 30, 2016. This permit covers all areas located within the political boundary of the City of Hialeah that is served by the MS4 <br />owned or operated by the City. The purpose of this assessment program is to provide information for the City of Hialeah to determine the overall <br />effectiveness of its Stormwater Management Program (SWMP) in reducing stormwater pollutant loadings from its Municipal Separate Storm <br />Sewer System (MS4) to receiving water bodies. Cost/Fees Paid: $9,772; Construction Cost: N/A <br />d. <br />(1) TITLE AND LOCATION (City and State)43-year CDBG improvements, NW 2nd Avenue from NW 4th Street to NW 5th Street -City of Hallandale Beach, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmEngineer of Record for the drainage design of City streets improvements. These improvements will upgrade physical/aesthetic appearance that <br />will complement housing development and rehabilitation as well as promote more attractive neighborhoods. In general, the improvements include <br />sidewalk replacement, minor drainage improvements, milling and resurfacing, new ADA compliant ramps and sodding. <br />Cost/Fees Paid: $28,155 – Construction Cost: $87,000. <br />e. <br />(1) TITLE AND LOCATION (City and State)Lakeshore and River Run Park Improvements – City of Miramar, Florida (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Manager and EOR for master planning and civil design of the improvements. Improvements included building modifications, additional <br />parking, new lighting, grading and drainage and reconfiguration of existing parking, and park appurtenances such as benches, trash collectors, <br />new fountains and playgrounds. Cost/Fees Paid: $118,604.64 – Construction Cost: $700,000.00. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2