E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.) 12. NAME
<br />ROBERT J. BEHAR, PE
<br /> 13. ROLE IN THIS CONTRACT
<br />Civil Engineering, Maintenance ofTraffic
<br /> 14. YEARS EXPERIENCE a. TOTAL45
<br /> b. WITH CURRENT FIRM21
<br />15. FIRM NAME AND LOCATION (City and State)R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />16. EDUCATION (Degree and Specialization)M.E. Structural Engineering, University of FloridaB.S. Civil Engineering, University of Florida
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)P.E. No. 21755 Florida, 1980
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)Mr. Behar is a voting member of the Florida Greenbook Committee. He was an original member and helped develop the American Society of
<br />Civil Engineers (ASCE) publication “Context Sensitive Highway Design Principles” and he is currently a member of the Subcommittee for the
<br />development of the Complete Streets Chapter in the Florida Greenbook. Mr. Behar was awarded the Ben Watts Partnership Award in 2010.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)W.76th Street from Hialeah Gardens Boulevard to W. 36 Avenue, Miami-Dade County, Florida – City of Hialeah
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Manager who was responsible for the lighting design calculations and lighting plans; signing, marking and channelization
<br />plans as well. The scope of this project consisted of roadway reconstruction and some milling and resurfacing of a two-lane road,
<br />curb and gutter type F, valley gutter, new sidewalks, on-street parking, exfiltration drainage systems, storm sewers, sodding,
<br />signing, pavement markings, and roadway lighting. This is part of the continuous neighborhood improvement program the City
<br />has been conducting for years. Under this program RJ Behar has completed more than 50 miles of City street improvements.
<br />Cost/Fees Paid: $50,038.00 Construction Cost: $ 1,110,000
<br />b.
<br />(1) TITLE AND LOCATION (City and State)Miami River Greenways, Segment D, Miami-Dade County, Florida – City of Miami
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2011
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Manager who was responsible for the reconstruction of an existing roadway segment along the Miami River to produce a
<br />scenic, landscaped, pedestrian/bicycle walkway/greenway. The project includes the design of a drainage system with injection
<br />wells, decorative lighting, and landscape/hardscape design. Cost/Fees Paid: $326,957 Construction Cost: $3,200,000
<br />c.
<br />(1) TITLE AND LOCATION (City and State)NE 151st Street Improvements, Miami-Dade County, Florida – Oleta Partners LLC/Miami-Dade County
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES Ongoing
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Principal in Charge for the final design for the reconstruction of a segment of NE 151st Street from west of US 1/SR 5 to Bay Vista Boulevard (1
<br />mile) within the City of North Miami. Scope of services includes roadway design, drainage design, signing and pavement markings,
<br />signalization, lighting, wetland assessment, contamination assessment and overall utility coordination. NE 151st Street is an off-system roadway
<br />bound by the Florida Greenbook for its design criteria. Project Length: 0.876 miles; Cost/Fees Paid: $498,000.00; Construction Cost:
<br />$5,757,000.00.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)NW 87th Avenue, Miami-Dade County, Florida –FDOT, District 6 (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmPrincipal in Charge/Project Manager for roadway design of new construction and reconstruction. This project included roadway plans, drainage,
<br />traffic, lighting, signing and marking, signalization and bridge plans. He assisted during construction, which included post design services,
<br />providing responses to RFIs and request for modifications, meeting in the field with the Contractor and Construction Inspection Team. Project
<br />length: 2 miles FM#: 405615-3-52-01; Cost/Fees Paid: $2,994,823.00; Construction Cost: $34,800,000
<br />e.
<br />(1) TITLE AND LOCATION (City and State)I-95 At 6th Avenue Interchange PD&E, Palm Beach County, Florida – FDOT,District 4
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Principal in Charge for the preparation of the Interchange Modification Report, all engineering analyses, Contamination Assessment Report,
<br />project management, cost estimates, and preparation of the Preliminary Engineering Report and the Class of Action (Categorical Exclusion
<br />Type II) documents. The major project issues were traffic congestion, possible relocations, 4(f) properties, major utilities, and location of
<br />wellfields. FM No.: 436963-1-22-01; Contract No.: C9N55; Cost/Fees Paid: $786,766.00; Construction Cost: $14,000,000.
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
|