Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> 12. NAME <br />JOSSMEL CRUZ-GARCIA, MS, EI <br />13. ROLE IN THIS CONTRACT <br />Structural/Roadside Barriers & <br />Guiderails/Designer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />3 <br />b. WITH CURRENT FIRM <br />3 <br />15. FIRM NAME AND LOCATION (City and State) <br />R.J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, Florida 33332 <br />16. EDUCATION (Degree and Specialization) <br />M.E. Structural Engineering, University of Puerto Rico, July 16, 2017 <br />B.S. Civil Engineering, University of Puerto Rico, June 2015 <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Engineer Intern No. 1100023398, 2019 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />At RJ Behar he works in the design of structural elements and performs inspections of infrastructure and building projects. H e has a <br />thorough understanding of advanced structural engineering and the associated computer skills. His experience has included design <br />of water control structures; miscellaneous structures; signal mast arm foundations; seawall design and rehabilitation; and <br />development of structural applications of metallic, non-metallic or composite materials for ships. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br /> SR 25/Okeechobee Road from W. 7th Avenue to NW 36th Street, Miami-Dade <br />County, Florida – Florida Department of Transportation (FDOT), District 6 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Structural Engineer: As part of the post-design services, he was responsible for reviewing the mast arm and overhead cantilever sign shop <br />drawings; reviewing the mast arm design calculations shop drawings; reviewed the cantilever sign foundation shop drawings; reviewed the multi- <br />post foundation shop drawings; designed spread footings for the light pole; and performed the structural design of a barrier wall for pier protection. <br />Project #: 425979-2-32-01; Cost/Fees Paid: $524,942.00; Construction Cost: 1,680,000.00; Project Length: 1.506 miles. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />NW 87th Avenue, Miami-Dade County, Florida – FDOT, District 6 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer who designed and checked shop drawings for the light pole spread footers. He also designed and checked shop drawings for <br />the pedestrian post special foundation detail. Project Length: 2 miles. <br />FM#: 405615-3-52-01 – Cost/Fees Paid: $2,994,823.00 – Construction Cost: $34,800,000.00 (Estimated). <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Booster Stations Seawall Repair #1, Miami-Dade County, Florida – Town of <br />Medley <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Structural Lead Engineer for designing rows of pre-stressed soil anchors (or similar drilled-in tiebacks) to provide horizontal resistance for the <br />upper portion of an existing seawall. The repair will run the full length of the south pump station seawall plus roughly 10’ on each side of the pump <br />station building. Structural design of the wall will follow the requirements and recommendations of the Florida Department of Transportation <br />Structure Design Guidelines, dated January 2016, Chapter 3 for Retaining Walls. Wall design calculations, assumptions, etc., will be documented <br />in a computation book report. He was also responsible for assisting with hydraulic calculations, estimates of probable cost and permitting. <br />Cost/Fees Paid: $41,961.37 – Construction Cost: N/A. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Booster Stations Seawall Repair #1, Miami-Dade County, Florida – Town of <br />Medley <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Structural Lead Engineer for designing rows of pre-stressed soil anchors (or similar drilled-in tiebacks) to provide horizontal resistance for the <br />upper portion of an existing seawall. The repair will run the full length of the south pump station seawall plus roughly 10’ on each side of the pump <br />station building. Structural design of the wall will follow the requirements and recommendations of the Florida Department of Transportation <br />Structure Design Guidelines, dated January 2016, Chapter 3 for Retaining Walls. Wall design calculations, assumptions, etc., will be documented <br />in a computation book report. He was also responsible for assisting with hydraulic calculations, estimates of probable cost and permitting. <br />Cost/Fees Paid: $41,961.37 – Construction Cost: N/A. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Seawall Design at Tobie Wilson Park, Miami-Dade County, Florida – Town of <br />Medley <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer who is assisting with the structural analysis and design, and plans preparation. The scope of work will include design of <br />approximately 850 feet of a new bulkhead wall located along the south bank of the Miami Canal. Cost/Fees Paid: $112,000 – Construction Cost: <br />$2,800,000 (Estimated). <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2