|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person) 12. NAME NANETTE AKYAZ-GOMEZ
<br /> 13. ROLE IN THIS CONTRACT
<br /> Designer
<br /> 14. YEARS EXPERIENCE a. TOTAL20
<br /> b. WITH CURRENT FIRM19 15. FIRM NAME AND LOCATION (City and State) R. J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302
<br /> Pembroke Pines, FL 33332
<br />16. EDUCATION (Degree and Specialization)
<br />A.A. Degree/Broward Community College, 1992
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)N/A
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />At RJ Behar, Ms. Akyaz is responsible for plans preparation in MicroStation Geopak software. Her design skills include
<br />development of complex highway alignment, integrating drainage and utility information, digital plan submittals and participation in
<br />plan review and quality control efforts using District 4’s ERC module.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)NE 151st Street Improvements, Miami-Dade County, Florida – Oleta
<br />Partners LLC/Miami-Dade County
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmDesigner. She is responsible for preparing the roadway design plans. The scope of the project includes roadway design, Temporary
<br />Traffic Control Plan (TTCP) design, pavement marking and signing, signalization, lighting, drainage and permitting, utility
<br />coordination, contamination assessment and wetland delineation/assessment. Cost/Fees Paid: $498,000.00 Construction Cost:
<br />$ 5,757,000 Project Length: 0.876 miles
<br />b.
<br />(1) TITLE AND LOCATION (City and State)NW 87th Avenue, Miami-Dade County, Florida – Florida Department of
<br />Transportation (FDOT), District 6
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmRoadway Designer: She assisted with preparation of roadway design plans and was responsible for quantities. The scope of
<br />services for this project included Roadway/TTCP design, pavement marking and signing, signalization, lighting, drainage and
<br />permitting, bridge construction, utility coordination, traffic study, traffic counts, traffic projections, and traffic warrants services.
<br />Project Length: 2 miles. FM#: 405615-3-52-01 – Cost/Fees Paid: $2,994,823.00 – Construction Cost: $34,800,000.00
<br />c.
<br />(1) TITLE AND LOCATION (City and State)SR-5/US-1/Biscayne Boulevard Resurfacing from NE 199th Street to NW 213th
<br />Street, Miami-Dade County, Florida – FDOT, District 6
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Designer responsible for production of the roadway plans. The scope of services includes milling and resurfacing, signing
<br />and pavement markings, traffic control plans and ADA and pedestrian features upgrades. Project Length: 1.2 miles Project No.:
<br />414624-3-32-01; Cost/Fees Paid: $228,638.00 – Construction Cost: $3,520,907.11
<br />d.
<br />(1) TITLE AND LOCATION (City and State)E. 6
<br />th Avenue to E. 8th Avenue from Hialeah Drive to E. 5th Street – City ofHialeah, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Designer: She was responsible for the plan’s preparation. The scope of this project consisted of roadway reconstruction and
<br />some roadway milling and resurfacing for a two-lane road, curb and gutter Type F, curb valley gutter, sidewalk, on-street parking,
<br />exfiltration drainage system, storm sewers, sodding, signing and pavement markings and roadway lighting. Cost/Fees Paid:
<br />$185,378.00 - Construction Cost: $2,983,967.00 - Project Length: 1.210 miles
<br />e.
<br />(1) TITLE AND LOCATION (City and State)SR-7/US-441 Roadway Lighting and NW 11th Place Pedestrian Lighting
<br />Improvements, City of Lauderhill, Florida – FDOT, District 4; LAP Project
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Designer: She was responsible for the plan’s preparation. The scope of this project included milling and resurfacing,
<br />installation of decorative stamped concrete and asphalt, lighting, landscaping, and street furniture. This was a FDOT Local Agency
<br />Program (LAP) Project. Project No.: 424311-1-52-1 Project length: 0.45 miles. Cost/Fees Paid: $65,601.00 – Construction Cost:
<br />$430,000.00
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
|