Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) 12. NAME NANETTE AKYAZ-GOMEZ <br /> 13. ROLE IN THIS CONTRACT <br /> Designer <br /> 14. YEARS EXPERIENCE a. TOTAL20 <br /> b. WITH CURRENT FIRM19 15. FIRM NAME AND LOCATION (City and State) R. J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 <br /> Pembroke Pines, FL 33332 <br />16. EDUCATION (Degree and Specialization) <br />A.A. Degree/Broward Community College, 1992 <br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)N/A <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />At RJ Behar, Ms. Akyaz is responsible for plans preparation in MicroStation Geopak software. Her design skills include <br />development of complex highway alignment, integrating drainage and utility information, digital plan submittals and participation in <br />plan review and quality control efforts using District 4’s ERC module. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State)NE 151st Street Improvements, Miami-Dade County, Florida – Oleta <br />Partners LLC/Miami-Dade County <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmDesigner. She is responsible for preparing the roadway design plans. The scope of the project includes roadway design, Temporary <br />Traffic Control Plan (TTCP) design, pavement marking and signing, signalization, lighting, drainage and permitting, utility <br />coordination, contamination assessment and wetland delineation/assessment. Cost/Fees Paid: $498,000.00 Construction Cost: <br />$ 5,757,000 Project Length: 0.876 miles <br />b. <br />(1) TITLE AND LOCATION (City and State)NW 87th Avenue, Miami-Dade County, Florida – Florida Department of <br />Transportation (FDOT), District 6 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmRoadway Designer: She assisted with preparation of roadway design plans and was responsible for quantities. The scope of <br />services for this project included Roadway/TTCP design, pavement marking and signing, signalization, lighting, drainage and <br />permitting, bridge construction, utility coordination, traffic study, traffic counts, traffic projections, and traffic warrants services. <br />Project Length: 2 miles. FM#: 405615-3-52-01 – Cost/Fees Paid: $2,994,823.00 – Construction Cost: $34,800,000.00 <br />c. <br />(1) TITLE AND LOCATION (City and State)SR-5/US-1/Biscayne Boulevard Resurfacing from NE 199th Street to NW 213th <br />Street, Miami-Dade County, Florida – FDOT, District 6 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Designer responsible for production of the roadway plans. The scope of services includes milling and resurfacing, signing <br />and pavement markings, traffic control plans and ADA and pedestrian features upgrades. Project Length: 1.2 miles Project No.: <br />414624-3-32-01; Cost/Fees Paid: $228,638.00 – Construction Cost: $3,520,907.11 <br />d. <br />(1) TITLE AND LOCATION (City and State)E. 6 <br />th Avenue to E. 8th Avenue from Hialeah Drive to E. 5th Street – City ofHialeah, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Designer: She was responsible for the plan’s preparation. The scope of this project consisted of roadway reconstruction and <br />some roadway milling and resurfacing for a two-lane road, curb and gutter Type F, curb valley gutter, sidewalk, on-street parking, <br />exfiltration drainage system, storm sewers, sodding, signing and pavement markings and roadway lighting. Cost/Fees Paid: <br />$185,378.00 - Construction Cost: $2,983,967.00 - Project Length: 1.210 miles <br />e. <br />(1) TITLE AND LOCATION (City and State)SR-7/US-441 Roadway Lighting and NW 11th Place Pedestrian Lighting <br />Improvements, City of Lauderhill, Florida – FDOT, District 4; LAP Project <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Designer: She was responsible for the plan’s preparation. The scope of this project included milling and resurfacing, <br />installation of decorative stamped concrete and asphalt, lighting, landscaping, and street furniture. This was a FDOT Local Agency <br />Program (LAP) Project. Project No.: 424311-1-52-1 Project length: 0.45 miles. Cost/Fees Paid: $65,601.00 – Construction Cost: <br />$430,000.00 <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2