My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Hardesty & Hanover, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 10:58:06 AM
Creation date
11/23/2020 10:53:21 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />A detailed quality control process will be <br />used for each submitted document. Prior to <br />initiation of the quality control process, our <br />Project Manager will review and coordinate <br />with the Originator/Producer the <br />appropriate level of detail and information <br />for a given document type or class and level <br />of development. <br /> <br />Quality Control Stamp <br />Once the Originator/ Producer and Project Manager <br />have agreed that a document contains the appropriate <br />level of detail and information required at the phase <br />submission or is substantially complete and ready for <br />checking, a check print will be prepared, and the Project <br />Manager will assign it to the Checker. Each check print <br />shall bear a red quality control stamp with the <br />originator/producer’s initials and date in the “Ready for <br />Checking” boxes. The check print shall be designated as <br />final or for a specific phase submittal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.