My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Hardesty & Hanover, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 10:58:06 AM
Creation date
11/23/2020 10:53:21 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />QUALITY CONTROL PROCESS <br />Quality Management Plan (QMP) <br />The objective of the QMP, which we will provide for City and FDOT <br />review 20 days after NTP, is to provide tools to our project team <br />so that our professional services are performed and delivered in <br />accordance with applicable industry standards of care and to the <br />satisfaction of project scope requirements while remaining within <br />the allocated schedule and budget. <br />The project-specific QMP includes the H&H Quality Assurance Plan <br />and the H&H Quality Control Plan. A Project Specific Quality <br />Management Plan front end includes: <br />• Project Summary (scope, schedule, list of key personnel) <br />• Project Deliverables <br />• Witness Points or Other Project Reviews to be performed <br />• Project Specific Procedures, if applicable (unique contract <br />requirements, specific stamps, check lists, etc.) <br />• Project-specific QMPs, once approved by the firm and the <br />client, are unique to the project <br /> <br />Quality Control Plan <br />Quality control is a series of activities, actions and procedures <br />routinely undertaken to ensure that our services and their <br />representative work products are produced to the requisite <br />standard of care and in accordance with the defined technical <br />philosophy of the firm. The plan defines procedures for quality <br />control which minimize errors, discrepancies, and omissions in <br />H&H’s work products. Furthermore, such procedures are intended <br />to produce concise, delineated records of the in-house quality <br />control process. The intent is for each work product to be thoroughly <br />reviewed in detail by someone in addition to the review by the <br />Originator/Producer who prepared that work product for <br />conformity with generally accepted design and engineering practice. <br />
The URL can be used to link to this page
Your browser does not support the video tag.