My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Hardesty & Hanover, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 10:58:06 AM
Creation date
11/23/2020 10:53:21 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Construction Cost Estimate <br /> <br /> <br /> <br /> <br /> <br /> <br />NOTES: <br />▪ $2/lb is a very low unit cost to <br />underscore the difference. <br />▪ Steel box girders require lighting <br />and ventilation for internal <br />inspection. FUBs do not. <br />▪ Steel boxes must be painted in <br />this environment which costs <br />approx. $500k. <br />▪ Painting requires lane closures <br />with traffic disruption. <br />From 2019 RFP Addendum #1 <br />▪ Total Budget: $13,050,000 <br />▪ Design Budget: $1,995,000 <br />▪ Construction Budget (Total Budget - Design Budget): $11M <br />Preliminary Construction Estimate: $7M << $11M <br />▪ Includes $600k contingency <br />Cost Comparison: <br />▪ FUBs = $360k <br />▪ Steel Box Girders = 150ft*1500lb/ft*$2/lb * 3 Girders = $1.3M <br />▪ Difference of over $1M in just main girders if steel used!
The URL can be used to link to this page
Your browser does not support the video tag.