My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 11:01:33 AM
Creation date
11/23/2020 10:59:19 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Winston Lucky, MSCE, EI, CGC Project Engineer - Traffic 27 2 <br />Choice Engineering Consultants, Inc (Miami, FL) <br />MS in Civil Engineering <br />MOT Advanced Certificate <br />SR 94 Kendal Dr / RRR From SW 132nd St to SW 122nd Ave - FDOT D6 Ongoing Since 2018 <br />Lead Roadway Engineer responsible for the design of this 1-mile urban segment of Kendall Drive, in Miami-Dade County. The project improvements include milling <br />and resurfacing, minor widening, signing and pavement marking, ADA compliance, minor lighting improvements and pedestrian signal improvements. This project <br />required significant maintenance of traffic coordination with adjacent projects, to the west and the HEFT Interchange Improvements. <br />ADA Districtwide Consultant - FDOT D6 <br />Pedestrian Safety Study at SR 90/ SW 8 Street and SW 44 Ave - FDOT D6 <br />SR 94 Kendall Dr / RRR - FDOT D6 <br />Safety Study at SR 5/ US 1 at SW 137 Ave - FDOT D6 <br />Ongoing Since 2018 <br />Ongoing Since 2018 <br />Ongoing Since 2018 <br />Ongoing Since 2019 <br />Project Engineer responsible for the implementation/review of ADA improvements performed by the District, ADA Plan Reviews, preparation of construction plans <br />for ADA only improvements to be constructed through the Work Program, technical memos addressing citizen and municipality complaints. Assisted the Department <br />as an in-house consultant supporting the Intermodal Systems Development Office in the coordination of all ADA related activities. <br />Lead Roadway Engineer responsible for post design services implementing design changes prompted by contractor to this 2.25-mile urban segment of Kendall Drive, in <br />Miami-Dade County including milling and resurfacing, minor widening, minor drainage improvements, bridge pier protection, signing and pavement markings, ADA <br />compliance, minor lighting improvements and pedestrian signal improvements. This project required significant maintenance of traffic coordination with adjacent <br />projects, MDX, CSX, Baptist Hospital and Dadeland Mall. <br />Senior Roadway Engineer responsible for roadway and signing and pavement markings disciplines. Improvements include design of a new mid-block crossing, new <br />signalized intersection, widening, milling and resurfacing, horizontal alignment improvements, signing and pavement markings. Improvements also includes addition of <br />ADA ramps, driveway improvements, R/W acquisition, and Temporary Construction Easement agreements. <br />Senior Roadway Engineer responsible for roadway and signing and pavement markings disciplines. Improvements include design for extending and widening the existing <br />US 1 SB Left Turn Storage Lane at SW 137 Ave , new left turn lane between SW 252 Street and SW 137 Ave, new signalized intersection, widening, milling and <br />resurfacing, horizontal alignment improvements, signing and pavement markings, addition and relocation of ADA ramps, and light improvements.
The URL can be used to link to this page
Your browser does not support the video tag.