My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 11:01:33 AM
Creation date
11/23/2020 10:59:19 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-6 <br />RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA E <br />NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE <br />100% Available <br />KT, Lin, PE, PhD. <br />Project Manager & Bridge Structures Lead <br /> 9 34 years of experience <br /> 9 34 years of experience in Bridge Structural Design, Analysis, <br />and Project Management <br /> 9 Major Bridge Experience - including, Segmental, Post- <br />tensioned Concrete, Steel Boxes, Steel Plate Girder. <br />Dr. Lin’s expertise includes structural analysis and <br />design for a wide variety of concrete and steel bridge <br />structures – including pedestrian bridges. He has <br />managed several structural projects including FDOT <br />projects. His expertise includes AASHTO, ACI, and AISC <br />Design Codes, local and state criteria. <br />He has been a Project Manager and Structures Design <br />Lead for several highly recognized bridge projects in <br />South Florida including: <br /> Â Hard Rock Pedestrian Bridges, City of Miami Gardens <br /> Â Golden Glades Pedestrian Bridge <br /> Â Port of Miami Bridge <br /> Â Miami Station Rail Infrastructure and Rail Viaduct, <br />Brightline Trains <br /> Â Venetian Causeway PD&E for Bridge Replacement of <br />12 Bridges <br />NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE <br />100% Available <br />Estephanie Romero <br />Deputy Project Manager <br /> 9 14 years transportation engineering experience including <br />movable bridges <br /> 9 Expertise in Bridge Design and Transportation Planning <br />Ms. Romero has experience with Bridge Planning <br />and Design, Technical Specifications, Cost Estimates, <br />Engineering Reports, and Structural Inspections. She <br />has served as Deputy Project Manager on several FDOT <br />D6 Projects. <br />Stephanie has been involved in highly recognized bridge <br />projects in South Florida including: <br /> Â FDOT D6 Venetian Causeway PD&E for Bridge <br />Replacement for Miami-Dade County DTPW and FDOT <br /> Â NW South River Drive Bridge over Tamiami Canal, FDOT <br />D6 and Miami-Dade County <br /> Â SR7/NW 5th Street Bridge, FDOT D6 <br /> Â Flagler Memorial Bridge SR A1A over ICWW, FDOT D4 <br /> Â Broad Causeway Bridge Rehabilitation, Town of Bay <br />Harbor <br /> Â Port Miami / FEC Railroad Bridge over Biscayne Bay, <br />Port Miami/FEC
The URL can be used to link to this page
Your browser does not support the video tag.