My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 11:01:33 AM
Creation date
11/23/2020 10:59:19 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-7 <br />RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA E <br />NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE <br />100% Available <br />Abid Hadrous, PE <br />Bridge Structures <br /> 9 37 years Transportation Engineering and Structures Design <br /> 9 Expertise includes Post-Tensioned Concrete, Concrete <br />Segmental Bridges, long span continuous Steel Plate and <br />Box Girder Bridges, convention minor bridge structures; FIB, <br />AASHTO Girder, CIP Flat Slab and Miscellaneous Structures <br />Mr. Hadrous’ Major Bridge design experience includes <br />Post-Tensioned Concrete, Concrete Segmental Bridges, <br />long span continuous Steel Plate and Box Girder Bridges. <br />Mr. Hadrous also has extensive experience in the <br />design of conventional / minor bridge structures (e.g., <br />Florida-I Beam, AASHTO Girder, C.I.P. Flat Slab), and <br />miscellaneous structures. <br />He has been a key designer for some of the highly <br />recognized bridge projects in South Florida including: <br />  Hard Rock Stadium Pedestrian Bridges <br />  Port of Miami Bridge <br />  I-75/I-595 Interchange Bridges <br />  I-95/Palm Beach International Airport Interchange <br />  Ft. Lauderdale/Hollywood International Airport <br />Interchange <br />  MDX 83628/ Widening of SR 836 from West of NW <br />57th to NW 17th Avenue - Concept Plans development <br />for 20+ bridge widening and 11 new bridge ramps. <br />NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE <br />100% Available <br />Dinesh Dagly, PE <br />Bridge Structures QA/QC <br /> 9 51 Years of Structures Design <br /> 9 Expertise includes Post-Tensioned Concrete, Concrete <br />Segmental Bridges, long span continuous Steel plate and <br />Box Girder Bridges, convention minor bridge structures; FIB, <br />AASHTO Girder, CIP Flat Slab and Miscellaneous Structures <br />Mr. Dagly has 51 years of experience in the structural <br />design of highway bridges, as well as elevated and <br />underground mass transit structures. He has many <br />years of experience working in FDOT projects involving <br />preparation of specifications packages, post design <br />services, and construction support. <br />Reviewer for the following major projects: <br />  MDX 836-11 Design-Build SR-836, I-395 and I-95 <br />South Bound to SR 836 Westbound - review of 19 new <br />and widened bridges <br />  Design-Build SR 836 Operational, Capacity and <br />Interchange Improvements from West 57th Ave to 17th <br />Ave (MDX) – Over 30 bridges, new widenings at nine <br />intersection roads and canal crossings. <br />Project Manager / Structural Designer for the <br />following major projects: <br />  Hard Rock Pedestrian Bridges <br />  Port of Miami Bridge <br />  I-95 and Spanish River Boulevard Interchange <br />  Ft. Lauderdale/Hollywood International Airport <br />Interchange
The URL can be used to link to this page
Your browser does not support the video tag.