Laserfiche WebLink
FDOT D4: I-595 Improvements Proposal Efforts, Sawgrass to Hiatus Rd, Broward County, FL. <br />PROFESSIONAL SERVICES <br />2009-2011 <br /> CONSTRUCTION <br />2010-2012 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />He served as a Project Engineer. His responsibilities included designing the drainage systems for 4 miles long corridor from Sawgrass <br />Expressway and I-595 interchange to East of Nobhill Road, analyzed the basin hydrology and hydraulics using ASAD and ICPR, prepared <br />drainage maps, master drainage plans, drainage structures, summary of drainage structures, computation book, performed hydraulics <br />calculation using ASAD, Flood routing using ICPR. He used PercPack to simulate the ground water interaction and laid out drainage <br />structures in plan and profile sheets, cut drainage structures using ASAD full version.