My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pedelta
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-10-01) Professional Engineering and Architectural Services for Ped.
>
Responses
>
Pedelta
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 12:15:43 PM
Creation date
11/23/2020 12:07:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;. C PEDELTA <br />CONSTRUCTION SEQUENCING AND STRATEGY <br />Sequencing both Design and Construction is key element of the Pedelta Team's bridge concept. The <br />construction of the bridge will have its own challenges. The bridge has been conceived to minimize <br />interference with Collins Avenue, including sidewalks and access to Sansom Park. <br />Pedelta will support the selected contractor to identify all critical and/or long -lead components, such as <br />stainless-steel suppliers in the US and steel fabricators. Pedelta team has already identified two potential <br />stainless-steel fabricators: Offenhauser Company and Mariani Metal. <br />Most of the bridge components will be prefabricated at the shop and assembled at the site to accelerate <br />construction and ensure quality. The steel parts will be prefabricated in sections to facilitate transport to the <br />site (2 to 3 sections are anticipated for both the arch and the tied girder). Both the tied girder and arch will be <br />fabricated to the required camber to compensate for deflections due to all dead loads and match the design <br />profile elevation. Design drawings will define the relaxed camber diagram that will be used to cut the plates <br />to shape the segments. All Stainless -Steel visible surfaces will be bead blasted after pickling to get a consistent <br />uniform dull finish with a natural silver color and remove all scale and surface contamination that arose from <br />fabrication. <br />PHASE 1: The construction will start with utility lines relocations, protection of pedestrian traffic adjacent to <br />the site, and the bridge and elevators footings using cast -in-place shafts or auger cast piles to prevent noise <br />and disturbances to neighboring residential areas. Upon delivery of the sections to the site, the arch and tied - <br />girder sections will be erected in pre-set positions on temporary supports in the staging area at close intervals <br />without hangers. The main field splices will be designed for field welding for aesthetic reasons. After <br />completion of the arch and once it is connected to the tied girder, the arch will be released to take up its true <br />shape. Then, the hangers will be installed, and hand tightened, and the intermediate supports of the tied <br />girder removed to let the hangers take up their steel dead load tension. <br />PHASE 2: The bridge superstructure will be then put into the final position with cranes placed at both ends. <br />The installation of the bridge will be done at night to avoid/minimize roadway traffic disruption. <br />Lifting of a 170 ft long stainless-steel structure over railway. Weight 125 tones. Bridge installation took less than 3 hours <br />City of Sunny Isles Beach <br />Request for Qualifications No. 20-10-01 <br />-12- <br />