Laserfiche WebLink
PEDELTA <br />PHASE 3: The bridge will be integral with the amphitheater structure (jointless). The bridge structure will be <br />connected to the amphitheater deck. Upon placement of the steel structure, the installation of pre -cast partial <br />depth concrete panels over the ribs will be done with small cranes for then pouring the top cast -in-place <br />concrete deck slab. After this operation, the hangers will take up their final permanent load tension. The <br />bridge will be completed with the finishes, including all landscape components. <br />Construction Sequencing Scheme <br />PHASE 1 <br />Build foundations, elevator on the west side and temporary <br />tower on the East sidewalk <br />PHASE 2 <br />Erection of the deck — arch structure over Collins Ave with one <br />crane pic <br />PHASE 3 <br />Erection of the remainder of deck, erection of the Amphitheater <br />and construction of staircase <br />City of Sunny Isles Beach <br />Request for Qualifications No. 20-10-01 <br />13- <br />