Laserfiche WebLink
PEDELTA <br />and construction of precast segmental bridges, review of longitudinal analyses, geometry control, usage of <br />complex erection equipment, pre -casting operations, shop drawings, method statements, post tensioning & <br />stay cable design and installation of seismic devices. He has FDOT experience gained though the construction <br />of the SR 826 (Palmetto Expressway) / SR 836 (Dolphin Expressway) Interchange Improvements in Miami and <br />the stay cable installation of the Pensacola Bay Bridge in Pensacola. Andrea has also experience with major <br />Design and Build bridge projects having served as the project director of the Manhattan West Platform in New <br />York City, one of the longest span -by -span precast segmental bridges in the world. <br />Fco. Javier Jordan, MSc, P.E. <br />Bridge Structural Design Team — Senior Bridge Structural Design Coordinator & CA/QC Manager <br />Javier has 25 years of experience as a Structural Bridge Engineer. He will be <br />performing critical coordination and liaison role on all TWOS among the sub - <br />consultant staffs ensuring seamless coordination, reporting and production. <br />He is well versed in technical operations and process and will coordinate <br />tasks for bridge design projects. He has developed and prepared bridge <br />construction plans, typical section packages, and performed complex <br />geometric and structural calculations. He will also create alignments, typical <br />sections, and traffic control plans for all phases of construction. Javier's experience includes structural <br />engineering, analysis, conceptual design and final detailing of bridges, preparation and supervision of drawings, <br />and technical specifications. As a bridge designer, Javier has an extensive background in structural analysis and <br />has conducted advanced time -dependent structural analysis models and complex construction analysis of steel <br />and major segmental and cable -supported concrete bridges, including finite element analysis, modeling and <br />seismic design using Caltrans specifications. He has long experience with the application of Accelerated Bridge <br />Construction Techniques. <br />Javier participated in the preparation of tenders of various FDOT's DB projects such as Palmetto managed <br />lanes, as well as leading the design team efforts in the ongoing project for MDX for the concept design of the <br />1.5 -mile viaduct included in the PD&E Study for the SR -924 at NW 32nd Ave. to NW 7th Ave. <br />Jamea Long (KH) - P. E. <br />Bridge Structural Design Team — Assistant Project Manager - Sr. Structural Engineer <br />Jamea is Structural Team Leader with 24 years of experience. She will provide support to our <br />Project Manager Andrea Travani as Assistant Project Manager for this project. Jamea has an <br />extensive structural design experience as sr. structural engineer and engineer of record <br />responsible for design of miscellaneous structures. She will be performing critical coordination <br />and liaison role on all TWOs among the sub -consultant staffs ensuring seamless coordination, <br />reporting and production. She is well versed in County operations and process and will <br />coordinate tasks for bridge design projects. Jamea worked for both public and private clients performing at <br />several KH projects in South Florida. Her responsibilities include performing calculations, coordinating plan <br />preparation, reviewing shop drawings, writing technical specifications, observing project construction, and <br />conducting structural inspections. <br />Jamea participated to the reconstruction of Krome Avenue project in Miami as well to the Pedestrian Bridge <br />Design and Roadway Improvements project in Miami Gardens, FL. <br />City of Sunny Isles Beach <br />Request for Qualifications No. 20-10-01 <br />31- <br />