Laserfiche WebLink
Building Code Services <br />Coastal Engineering <br />Code Enforcement <br />Construction Engineering <br />and Inspection <br />Construction Services <br />Contract Government <br />Data Technologies <br />and Development <br />Emergency Management <br />Services <br />Englneering <br />Environmental Services <br />Facilities Management <br />Indoor Air 0uality <br />Landscape Architecture <br />Municipal Engineering <br />Planning <br />Public Administration <br />Redevelopment <br />and Urban Design <br />Surveying and Mapping <br />Tra(tic Engineering <br />Transportation Planning <br />GSA Contract Nolder <br />1800 Eller Drive <br />Suite 600 <br />Fort Lauderdale, FL <br />33316 <br />954.921.7781 phone <br />954.921.8807 tax <br />www.cgasolullons.com <br />FORT LAUDERDALE <br />Calvin, Giordano & Associates, Inc. <br />E X C E P T I O N A L <br />SOL LITION Sm <br />December 19, 2017 <br />Ms. Claudia C. Hasbun, AICP <br />Planning and Zoning Director <br />City of Sunny Isles Beach <br />18070 Collins Avenue; Yd Floor <br />Sunny Isles Beach, FL 33160 <br />RE: AlA Decorative Lighting Project <br />FDOT Financial Project: 430949-1-52-02 <br />County: Miami -Dade <br />Project Description: A I A Decorative Lighting from Bayview Drive to SR-856 <br />Dear Ms. Hasbun, <br />We are pleased to submit this proposal and Scope of Work for Professional CEI Services on <br />the above referenced project. <br />I. Professional CEI Services: The following scope is based upon 18 months of <br />Construction Time/Contract Time, and on total hours of 1,485 for the Senior Inspector and <br />220 MH for the Construction Administrator. The man-hour estimate provided is based on <br />limited understanding of how the contractor will approach the project and limited schedule <br />information. It is CGA's understanding that a supplemental agreement will be executed to <br />add more funds in the case the above listed man-hours are exhausted. Day -time work only is <br />anticipated. Any additional time beyond this will require an approved agreement. The <br />anticipated scope of services include assistance with pre -construction activities and <br />coordination; and construction engineering observation services for A]A Decorative <br />Lighting Project in the City of Sunny Isles Beach <br />1. Assistance during bidding process -Not Included. <br />2. Construction Administration and Inspection Services <br />o Attend and participate in one (1) pre -construction meeting at Municipality <br />location; record/prepare/distribute meeting minutes. <br />o Schedule, attend and assist in conducting construction progress meetings at <br />Municipality location for the duration of the construction project as well as <br />prepare and distribute meeting minutes. <br />ATTACHMENT "A" <br />