My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2020-3143
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2020
>
Reso 2020-3143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 2:58:49 PM
Creation date
12/9/2020 11:49:41 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2020-3143
Date (mm/dd/yyyy)
11/19/2020
Description
1st Amendment w/CGA for construction engineering inspection services for the streetlight project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Receive and coordinate through the EOR, interpretations and clarifications of the <br />Contract Documents (RFI responses, plan revisions, and Work (Change) <br />Directives prepared by the EOR). In connection therewith, assist in the review and <br />processing of any work change directives or change orders <br />o Receive, and coordinate processing of shop drawings, samples and other data <br />which the Contractor is required to submit. <br />o Perform CEI Services including field observations for compliance with plans and <br />specifications; provide copies of observation reports to the FOR and City on a <br />weekly basis. Make interim inspections for substantial and final completion(s) to <br />determine, in general, if the work has been completed in conformance with the <br />intent of the Contract Documents. <br />o Ensure the Senior Inspector is present at all time when construction is taking <br />place on the field as required by the FDOT/City of SIB Agreement. <br />o Review, coordinate required revisions, and approve and payment application <br />requests; processing of applications by City. <br />o Attend and participate in meetings with the City, Contractor, Engineer and <br />appropriate regulatory agencies when requested by the City and necessary for <br />consultation and conferences in regard to construction of the project. <br />o Receive, review and process Contractor's construction schedule(s), and schedule <br />of values. . <br />3. FDOT Coordination <br />o Prepare bi-monthly construction reports as required per the FDOT/City of SIB <br />Agreement. <br />o Coordinate Construction Activities with Ms. Heidi Solaun the FDOT Assistant <br />District Construction Engineer <br />o Coordinating final inspections by FDOT as required per the FDOT/City of SIB <br />Agreement. <br />o Submit payment reimbursement packages to the FDOT on behalf of the City to <br />ensure expedited reimbursement. <br />o Coordinate contract modifications with FDOT as per the agreement between <br />FDOT and the City of SIB. <br />II. BASIS OF PROPOSAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.