Laserfiche WebLink
9, BID TRANSMITTAL, <br />9.1 It is the responsibility of the Bidder to be certain that the bid is in the physical possession <br />of Sourcewell on or prior to the deadline for submission of bids. <br />9.2 Bids must be submitted in a sealed envelope or box properly addressed to Sourcewell and <br />with the following information clearly marked on the outside of the envelope or box; <br />Solicitation number <br />Name of Solicitation <br />Geographic Area <br />r Deadline for bid submission <br />Y Bidder's name and address. <br />9.3 Bidders are solely responsible for ensuring all required documentation arrives at the <br />designated address no later than the date and time listed in this IFB. Sourcewell is not <br />responsible for late receipt of bids. Late proposals will not be considered. Bids received by <br />the correct deadline for bid submission will be opened and the name of each Bidder and <br />other appropriate information will be publicly read. <br />10. CONTRACTOR'S MANAGEMENT PLAN <br />10.1 The Bidder is required to submit its plan for management of the contract. The title of the <br />submittal shall be "MANAGEMENT PLAN FOR EXECUTION OF lQCC." The Contractor's <br />Management Plan must be submitted as part of the Bidder's bid documents. <br />10.2 In addition to the bid documents and other required submittals, the Contractor's <br />Management Plan will be used by Sourcewell to determine the responsibility of the Bidder <br />to perform the contract. Therefore, the Bidder should take great care in the preparation <br />of the Management Plan. <br />10.3 The Bidder may be determined non -responsive for failure to submit the Management Plan <br />and/or declared non -responsible for failure to adequately address the Issues below to the <br />satisfaction of Sourcewell. <br />10.4 The Management Plan shall include as a minimum the following information and <br />organized specifically as shown below: <br />1. State the number of years your company has been in the construction <br />industry, the type of work your company self -performs, and the type of <br />work your company typically subcontracts. <br />2. The awarded Contractor must have the capacity and capability to perform <br />multiple projects at multiple locations simultaneously. Demonstrate this <br />capacity and capability by providing six (6) projects that meet the following <br />information for each project over $25,000 completed in the last three (3) <br />years: Submit Bid Farm 6 for each Project. <br />a. Project title. <br />b, Geographic location, <br />c. Owner name and contact (title, address, email and phone number). <br />d. Project amount. <br />e. Project duration, start and finish dates. <br />March 2019 Section T.ve - Imtructions to Bidders 1s <br />