My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2020-3136
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2020
>
Reso 2020-3136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 2:57:34 PM
Creation date
12/9/2020 11:51:42 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2020-3136
Date (mm/dd/yyyy)
11/19/2020
Description
Team Contracting, Inc. for Design & Construction of ADA Stalls & Parking at Gwen Margolis Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOURCEWELL <br />Book 2 — IC7!CC Standard Terms. and Conditions. and Contract general Conditions <br />Corrections prison, the Contractor will be paid for the labor time Lost as a result of <br />such perimeter inspection, as well as any loss of time resulting from a temporary shut <br />down of the work site required by the facility, such as a temporary shut down to move <br />prisoners. <br />8.2.4 The value of the Price Proposal shall be calculated by summing the total of the <br />calculations for each Pre -priced Tasks (Unit Price x quantity x Adjustment Factor) plus <br />the value of all pion Pre -priced Tasks. <br />8.2.5 The Contractor shall submit a complete Proposal Package, which includes: <br />a. any incidental drawings or sketches, calculations and or specification <br />information, <br />b. the Price Proposal, and a quantity take -off summary supporting all material <br />quantities contained in the Price Proposal <br />c. catalog cuts providing information on materials or products, as specifically <br />requested, <br />d. back-up for any Non Pre -priced Tasks, <br />e. identification of known Subcontractors and material suppliers, <br />f. a construction schedule, <br />g. for special equipment or materials, warranty information, <br />8.2.6 8y submitting a Price Proposal to Sourcewell, the Contractor agrees to accomplish the <br />Detailed Scope of Work in accordance with the Request for Proposal at the price <br />submitted. It is the Contractor's responsibility to include the necessary tasks and <br />quantities in the Price Proposal and apply the appropriate Adjustment Factor(s) prior <br />to delivering it to Sourcewell. <br />8.2.7 Whenever, because of trade jurisdiction rules or small quantities, the cost of a minor <br />task in the Price Proposal is less than the cost of the actual labor and material to <br />perform such task, the Sourcewell Member may permit the Contractor to be paid for <br />such task as a Non-Prepriced Task, or use Prepriced labor tasks and material <br />component pricing to cover the actual costs incurred. Provided, however, that there <br />is no other work for that trade on the Project or other work for that trade cannot be <br />scheduled at the same time and the final charge does not exceed $5,000. <br />8.3 Time for Submittal of the Proposal Package <br />8.3.5 The Proposal Package shall be submitted by the date indicated on the Request for <br />Proposal. All incomplete Proposal Packages shall be rejected. The time allowed for <br />preparation of the Proposal Package will depend on the complexity and urgency of <br />the Project but should average between seven and fourteen days. On complex <br />Projects, such as those requiring incidental engineering/architectural drawings and <br />approvals and permits, allowance will be made to provide adequate time for <br />preparation and submittal of the necessary documents. <br />8.3.2 In emergency situations and for Projects requiring immediate completion, the <br />Proposal Package may be required quickly and the due date will be so indicated on <br />the Request for Proposal or, the Contractor may begin work immediately, with the <br />paperwork to follow. <br />8.3.3 If the Contractor fails to meet the deadline for submittal of the Proposal Package, this <br />may be reason to suspend issuance of this particluar Purchase Order, <br />1D Sr ction Two — Contract gcnora8 Condition, klarch 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.