SOURCEWELL <br />Book 2 — IQCC Standard Terms. and Conditions. and Contract General Conditions <br />not submit a quote or bid from any supplier or Subcontractor that the <br />Contractor is not prepared to use. Sourcewell may require additional <br />quotes and bids if the suppliers or Subcontractors are not acceptable or if <br />the prices are not deemed reasonable by Sourcewell or its designated <br />representative, <br />8.2.2.3 Pricing Non Pre -priced Tasks: The final price submitted for Non Pre -priced <br />Tasks shall be according to the following formula. Each Non Pre -priced Task <br />must be supported with the necessary back-up documents including the <br />calculation 'below: <br />For Work Performed with the Contractor's Own Forces: <br />1. The hourly rate for each trade classification not in the Construction <br />Task Catalog multiplied by the quantity; <br />2. The rate for each piece of Equipment not in the Construction Task <br />Catalog multiplied by the quantity, <br />3. Lowest of three independent quotes for all materials <br />Total Cost for self -perform work = (A+B+C) x NPP Adjustment Factor <br />For Work Performed by Subcontractors: If the Work is to be subcontracted, the <br />Contractor must submit three independent quotes from Subcontractors for the <br />Work. If three quotes or bids can not be obtained, the Contractor will provide the <br />reason in writing for Sourcewell Member's approval why three quotes cannot be <br />submitted. <br />D ® Lowest of three Subcontractor quotes <br />Total Cost of Subcontracted Non Pre -priced Task a D x NPP Adjustment Factor <br />8.2.2.4 At the discretion of Sourcewell (or their designated representative), Non <br />Pre -priced Tasks, as well as other Tasks, may be added to the CfC during <br />the course of the Agreement. Unit prices will be established based on actual <br />quotes from material suppliers and installers and fixed as a permanent Pre - <br />priced Task in the CTC. <br />8.2.23 Sourcewell (or their designated representative) determination as to <br />whether an item is a Pre -priced Task or a Non Pre -priced Task shall be final, <br />binding and conclusive as to the Contractor. <br />8.12.6 The means and methods of construction shall be such as the Contractor <br />may choose; subject however, to Sourcewell's right to reject means and <br />methods proposed by the Contractor that: <br />8.2.2.6.1 Will not produce finished Work in accordance with the terms of the <br />Contract; or <br />8.2.2.6.2 Unnecessarily increases the price of the Purchase Order when <br />alternative means and methods are available. <br />8.2.8 In the event the Contractor is required to work within a secured facility where labor, <br />material, and equipment must be inspected to pass through a secured perimeter, and <br />all work must be constantly monitored by facility personnel, such as a Department of <br />Section Trio — contract General Condition, N-larch 2019 <br />