My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2020-3136
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2020
>
Reso 2020-3136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 2:57:34 PM
Creation date
12/9/2020 11:51:42 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2020-3136
Date (mm/dd/yyyy)
11/19/2020
Description
Team Contracting, Inc. for Design & Construction of ADA Stalls & Parking at Gwen Margolis Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCILJRCE'J' ELL <br />Book 2 — lQCC Standard Terms and Conditions and Contract General Conditions <br />11.3 Punch List Work will be continuously prosecuted once begun and completedwithin thirty (30) <br />[days from the receipt of the Punch List, Should the Contractor fail to complete the Punch List <br />within this period of time, the liquidated damages as identified in Article 26 of the Contract <br />General Conditions will apply. <br />12, PAYMENT AND PERFORMANCE BONDS AND MATERIAL AND WORKMANSHIP <br />If required by the Sourcewell Member for a particular Work Order, the Contractor shall deliver a <br />Labor and Material Payment Bond and a Performance Bond in the amount of such Work Order. If <br />required by the Sourcewell Member for a particular Work Order, the Contractor shall deliver <br />Material and Workmanship Bonds in the amount required by the Sourcewell Member, The bonds <br />must be in a form, and executed by a surety, acceptable to the Sourcewell Member. The bonds must <br />be received before the Notice to Proceed will be issued. The Contractor shall be compensated for <br />the cost of the bonds up to 2% of the Work Order Price through the Reimbursable Fee work task in <br />the Construction Task Catalog. The Contractor shall apply a 1..1000 Adjustment Factor to the <br />Reimbursable Fee work task rather than applying the Contractor's competitively bid Adjustment <br />Factor. <br />13. COMPUTER SOFTWARE <br />The Contractor shall maintain at its office for its use a computer with an internet connection. The <br />Contractor will be furnished with a copy of the Internet based eGordian" software which will allow <br />the Contractor to generate Price Proposals. This software program contains an electronic copy of <br />the Construction Task Catalog and allows the Contractor to select items and quantities for use in a <br />particular Price Proposal. The software generates a Price Proposal in a preset format acceptable to <br />the Sourcewell Member. There is no separate charge to the Contractor for the software and the <br />related software training. <br />14. PREPAYMENT OPTION <br />A Sourcewell Member may elect to deposit the funds for any Project or Purchase Order in a special <br />account established by Sourcewell for the purpose of paying the Contractors for work to be <br />performed. Funds shall be transferred into and out of such account in strict accordance with the <br />rules and procedures established therefor. <br />Balance of Page Intentionally Left Blank <br />14 Section Two — Contract CeneraB Conditions, P-larch 201: ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.