Laserfiche WebLink
AIR HANDLING UNITS <br />Scope of work for routine inspections on Air Handlers <br />B Furnish and Replace Air Filters with 2 inch thick MEMI 8 pleataed filters <br />C Check and Purge drain fines as necessary <br />D Check Beta Tension ! Replace as necessary at prefered custorne i Prices <br />'E Lubricate bearings and moving parts, motors, bioerers. <br />F Check UFOs for proper operation <br />Scope of Work for Annual Inspections on Air Handlers <br />A Record pertinent system temperatures, pressures, and electrical readings necessary to determine <br />the existing operating condXms of the system. <br />B Shut down and Lock out ITag out of AHU <br />C Panel removal for component access <br />(j PIPES & VALVES <br />Stoke and exercise all valves once every sir months. To be done by building maintenance <br />Touch up paint on all pipes as needed to avoid premature detenioration and to maintain quality <br />appearance. This also includes pipe supports and springs.,To be done by building maintenance <br />a <br />