My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Light Er Up Mia LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 21-03-01 Holiday Lighting and Decorations
>
Responses
>
Light Er Up Mia LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2021 11:29:01 AM
Creation date
6/2/2021 11:14:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Light Er Up Mia LLC RFP No. 21-03-01. Holiday Lighting and Decorations <br /> <br />5 <br />of all decor. All staff is properly trained and experienced in commercial lighting products and <br />installation. Our team prides itself on reliable, expedient, and outstanding service. Preventive <br />Maintenance: Our co mbined team will test all lighting and decorations prior to final installation <br />completion. After completion, nightly inspections will identify the correct technician to provide <br />immediate response to complete any service. We will ensure all decorations and lighting are <br />properly working. <br /> <br />Trouble Shooting and Corrective Maintenance: Trained staff and technicians will be <br />notified immediately upon completion of nightly inspections. The staff will ensure expedient <br />response times to complete service or repairs. <br /> <br />Availability of Parts and Supplies: All decorations and lighting will be manufactured and <br />shipped with spare parts. In the event of repair or replacement, the decor will be replaced or <br />corrected with the spare parts. Light Er Up MIA ensures all decor is properly working for the <br />holiday season. In the event of damaged parts that cannot be replaced, we will Manufacture <br />decor in a timely manner for replacement. <br /> <br /> Performance Monitoring and Metrics: Pre-completion testing will be reported to the city as well <br />as any issues or changes based on installation. After completion, nightly inspections and reports <br />will be shared with the city. A detailed description of all decors and its status will be shared with <br />the city. A timeline for any repair will be noted in the report. <br /> <br /> <br />All Décor will be stored at our vast 70,000 SQFT location, located at 8200 NW 93rd street Suite, <br />1 Doral FL 33166 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.