My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2021-3192
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2021
>
Reso 2021-3192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2024 12:37:08 PM
Creation date
6/8/2021 12:26:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2021-3192
Date (mm/dd/yyyy)
05/20/2021
Description
Change Order No. 8 w/Nunez Construction for Gateway Park
Supplemental fields
Comment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br />Engineering Systems Technology, Inc. , Quo aw <br />Quote <br />tm <br />' Hialeah, FL 33016 Feb 1 Sth 2021 <br />(305) 823-7444 (Office) " <br />(305) 823-0553 (Fax) Gateway Park Change <br />Order #6 Total <br />To: Nunez Construction <br />From: Abraham Martinez <br />abraham@estfl.com <br />Part Number <br />Quantity <br />Description <br />1. <br />SIGA-OSD <br />3 <br />Edwards intelligent multi -criteria optical smoke detector UL/ULC <br />2. <br />SIGA-SB <br />3 <br />Detector Base - Standard <br />3. <br />SIGA-278 <br />1 <br />Manual Pull Station - Double Action 1-stage <br />4. <br />G4VWF <br />2 <br />Wall Strobe 15-110cd White FIRE Marking. GP10 Room Side Wiring <br />Plate included. Additional Trim available G4TW. <br />5. <br />GP10 <br />1 <br />Universal Mounting Plate 10 Pack <br />6. <br />302-ET 135 <br />2 <br />Heat Detector - Rate Compensation All-weather Vertical Box Mount <br />(1/2 NPT) FM & UL- 135?F (Requires STONCO27 or equal) <br />7. <br />STONCO27 <br />2 <br />4" Weather-proof, octagon backbox and cover (1/2"thread hubs <br />back, four sides and cover) <br />8 <br />SIGA-CT1 <br />2 <br />Single Input Module. <br />9. <br />PERMIT FEE <br />1 <br />Permit and Runner Fees. Major Plan Revision after the system <br />upgrade and SRI inspections fees. <br />10. <br />EST -LABOR <br />1 <br />Labor performed by EST technician: <br />11. <br />EST-PROG <br />1 <br />Labor performed by EST technician to program fire alarm system <br />and/or devices. <br />
The URL can be used to link to this page
Your browser does not support the video tag.