My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2021-3192
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2021
>
Reso 2021-3192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2024 12:37:08 PM
Creation date
6/8/2021 12:26:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2021-3192
Date (mm/dd/yyyy)
05/20/2021
Description
Change Order No. 8 w/Nunez Construction for Gateway Park
Supplemental fields
Comment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineering Systems Technology, Inc. <br />2400 W 84th Street, Unit 9 <br />Hialeah, FL 33016 <br />(305) 823-7444 (Office) <br />(305) 823-0553 (Fax) <br />Total: $7,506.24 <br />Customer Approval: <br />Dater <br />PO Number: <br />Terms: I. The price covers only the material listed above. <br />Name/Title: <br />Quotation <br />Quote #: 4CR-4NVJ1 <br />Feb 15th 2021 <br />Gateway Park Change <br />Order #6 Total <br />2. Prices quoted are valid for a period of 30 days. <br />3. All material listed on the quote to be picked up at our warehouse in Hialeah, FL with material originating from factory <br />shipped via ground shipments. Expedited shipments not on hand in our Hialeah warehouse will incur additional shipping <br />charges. <br />6.Includes <br />a)- Addition of 3 smoke detectors,'I pull station, and 2 strobe lights devices, in order to provide proper coverage to the Sunny <br />Isles Beach City Staff Storage Room located-on-1he list floor. The size of this storage area was no properly depicted In the As - <br />Built drawings of the bit iMmgfcnome reason, and the equipment required to properly cover that area was not included in the <br />original proposal. <br />b)- Equipment and required labor are included In this proposal. <br />c)- Includes Permit and Runner fees for The Miami Dade Fire Department Mayor Plan Revision. The receipt from Miami Dade <br />will be provided with this Quote for reference. <br />7 Includes: <br />a) Adition of 2 new weatherproof heat detectors in the elevator pit, requested by the fire inspector. <br />b) Includes 8 hours of labor/ 2 Installers required. <br />c) Inchrtles 2 hourr, to program the new dF.-Acae follow1ltg thr, required sequence of operation. <br />li. Includes: y' 1, r_ i, o r. j <br />`;RI Inspection Fces regarding Inspection on 1-27-7,021, Ihlspector raquoshrd now heat detectors in the elevator Pit <br />9 Includes: <br />�SRI Inspection Fees regarding inspection an 2-12-2021, Final inspection with Lt. Guillard, before plan revision. 6 t <br />Cost Breakdown: <br />Equipment: $1763.88 <br />Labor: 83320 (In'stallation and programming) <br />Permit and Runner Fees: $2,422.36 <br />EST Approval: <br />Date: f / <br />Name/Title: <br />Quote is not valid until approved by E.S.7 personnel. <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.