My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2252
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2252
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 2:52:48 PM
Creation date
7/7/2014 3:16:49 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2252
Date (mm/dd/yyyy)
06/19/2014
Description
Agmt w/Bermello Ajamil for Construction Phase Srvs for Arlen House Right-of-Way
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arlen House ROW B &A CA Services Proposal Page 3 of 4 <br />Deliverables for Task Ill Inspections & Record Drawings Review - As a result of these tasks, B&A <br />shall produce the following: <br />One (l ) 8 %2" X 1 1 " black and white Inspection Observation Memo <br />One (1) 8 %2" X 1 1 " black and white 'As- Built' Review Memo. <br />TASK IV - SUBSTANTIAL COMPLETION, PUNCH LIST AND FINAL COMPLETION: <br />Substantial Completion Walk Through - B &A shall visit the site one (1) time to conduct a <br />Substantial Completion Site Inspection to determine if the completed work by the Contractor is <br />in general accordance with Construction Drawings and shall provide a punch list of outstanding <br />issues that need to be completed /corrected. This service shall be completed in addition to visits <br />and meetings described in Task II. <br />Final Engineering Certification - The Consultant shall review the record drawings provided by the <br />Contractor or obtained by other means agreed to by the City. The preparation of record <br />drawings by B &A is not included. Upon satisfactory review of the record drawings, the <br />Consultant shall prepare and submit the final certification packages to the applicable agencies. <br />This service will be completed in addition to visits and meetings described in Task II. <br />Final Completion Walk Through - B &A will visit the site one (1) time to conduct /complete a Final <br />Completion Inspection to determine if the completed work by the Contractor is in general <br />accordance with Construction Drawings and that all punch list items have been resolved. B &A <br />shall provide a Final Completion Notice to the City once the project is deemed to be in full <br />accordance with the Construction Drawings. This service shall be completed in addition to visits <br />and meetings described in Task II. Additional inspections or walk- throughs required due to <br />contractors inability to complete all punch list items the first time shall be billed to the client on <br />an hourly basis. <br />Deliverables for Task IV Substantial Completion, Punch List and Final Completion - As a result of <br />these tasks, B&A shall produce the following: <br />One (1) 8 %2" X 1 1" black and white Substantial Completion Punch List <br />One (1) 8 %2" X 1 1 " black and white Final Engineering Certification <br />One (1) 8 %2" X 11 " black and white Final Completion Notice <br />
The URL can be used to link to this page
Your browser does not support the video tag.