Laserfiche WebLink
used by the Contractor, Sub - Contractors, and /or material suppliers on other projects, without <br />the specific express written consent of the City. The Contractor, Sub - Contractors, and/or material <br />suppliers are granted only a limited license to use and reproduce applicable portions of the <br />Drawings, Specifications, and other documents prepared by the City or its designee, appropriate to <br />and for use in the execution of their Work under this Agreement. <br />ARTICLE 16. PLANS, SPECIFICATIONS AND WORKING DRAWINGS <br />16.1 The City shall have the right to modify the details of the Plans, Specifications, and <br />Working Drawings with additional plans, drawings or additional information as the Work <br />proceeds, all of which shall be considered as part of the Contract Documents. <br />16.2 Where the Contractor believes that the modification or supplement is outside the <br />Scope of the Work, the Contractor shall, within 72 hours, notify the City that the modification <br />or supplement is outside the scope of the Work. At that time the modification or supplement may be <br />rescinded or the Contractor may be required to submit a request for a Change Order proposal. <br />Where the Contractor is notified of the City's position that the modification or supplement is <br />within the scope and the Contractor disagrees, the Contractor shall notify the City that the <br />Contractor reserves the right to make a claim for the time and monies based on the modification <br />or supplement. At no time shall the Contractor refuse to comply with the modification or <br />supplement. <br />16.3 When, in the opinion of the City, it becomes necessary to explain the Work to be done <br />more fully, or to illustrate the Work further, or to show any changes which may be required, <br />supplementary drawings, with specifications pertaining thereto, will be prepared by the City or <br />its Designee. The supplementary drawings shall be binding upon Contractor with the same force <br />as the Contract Documents. Where such supplementary drawings require either less or more than <br />the original quantities of work, appropriate adjustments shall be made by Change Order. <br />16.4 The City shall have the right to approve and issue Supplemental Instructions setting forth <br />written orders, instructions, or interpretations concerning the Contract Documents or its <br />performance. <br />ARTICLE 17. CONTINUING THE WORK <br />Contractor shall carry on the Work and adhere to the progress schedule during all disputes or <br />disagreements with the City, including, without limitation, disputes or disagreements concerning a <br />request for a Change Order, the Contract Amount, the Contract Time, or Time for Completion. <br />The Work shall not be delayed or postponed pending resolution of any disputes or <br />disagreements. All disputes shall be resolved in accordance with Article 35 pertaining to <br />Mediation and Arbitration of Disputes. <br />ARTICLE 18. AUTHORITY OF THE CITY <br />18.1 The City Manager or his designee shall determine or answer, all questions of any nature <br />whatsoever arising out of, under or in connection with, or in any way relating to or on account of <br />the Work, and/or as to the interpretation of the Work to be performed. <br />11 <br />