My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2251
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2015 3:32:27 PM
Creation date
7/7/2014 3:35:53 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2251
Date (mm/dd/yyyy)
06/19/2014
Description
Awd Bid 14-04-01/Agmt w/Lynx Construction: Arlen House Right-of-Way Improvemts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18.2 The Contractor shall be bound by all determinations or orders of the City Manager or <br />his designee and shall promptly respond to requests of the City Manager or his designee, <br />including the withdrawal or modification of any previous order, and regardless of whether the <br />Contractor agrees with the City Manager or their designee's determination or requests. <br />18.3 All instructions to the Contractor shall be issued in writing. All instructions to the <br />Contractor shall be issued through the City Manager or his designee. <br />18.4 The City shall have access to the Project Site during normal work hours, unless access <br />is required by the City due to health, safety or welfare of the City or the public. The Contractor <br />shall provide safe facilities for such access so the City may perform their functions under the <br />Agreement. The City will make periodic visits to the Work Site to become generally familiar with <br />the progress and quality of the Work, and to determine if the Work is proceeding in accordance with <br />the Contract Documents. <br />18.5 The City will not be responsible for construction means, methods, techniques, sequences <br />or procedures, or for safety precautions and programs in connection with the Work, and will <br />not be responsible for the Contractor's failure to carry out the Work in accordance with the <br />Agreement. <br />18.6 The City Manager or his designee will have authority to reject Work that does not <br />conform to the Contract Documents requirements. Whenever it is considered necessary or <br />advisable to ensure the proper implementation of the Contract Documents, the City will have <br />authority to require special inspections or testing of the Work, whether or not such Work is <br />fabricated, installed or completed. Neither the City Manager or their designee's authority to act <br />under this Article, nor any decision made by the City Manager or their designee in good faith <br />either to exercise or not to exercise such authority, shall give rise to any duty or responsibility of <br />the City to the Contractor, any Sub - Contractor, supplier or any of their agents, employees, or any <br />other person performing any of the Work. <br />18.7 The City will not be responsible for the acts or omissions of the Contractor, or anyone <br />employed or contracted directly or indirectly by the Contractor including any Sub - Contractor, or <br />any of their agents or employees, or any other persons performing any of the Work. <br />ARTICLE 19. DEFECTIVE WORK <br />19.1 The City shall have the authority to reject or disapprove Work which is found to be <br />defective. If defective work is found, Contractor shall promptly either correct all defective work <br />or remove such defective Work and replace it with non - defective Work. Contractor shall bear all <br />direct and indirect costs of such removal or corrections including cost of testing laboratories <br />and personnel. <br />19.2 Should Contractor fail or refuse to remove or correct any defective Work or to make any <br />necessary repairs in accordance with the requirements of the Contract Documents within the <br />time indicated in writing by the City Manager or his designee, the City shall have the authority to <br />cause the defective work to be removed or corrected, or make such repairs as may be necessary at <br />Contractor's expense. Any expense incurred by the City in making such removals, corrections or <br />repairs, shall be paid for out of any monies due or which may become due to Contractor, or may <br />be charged against the Payment and Performance Bond. In the event of failure of Contractor to <br />make all necessary repairs promptly and fully, which is not cured in the Cure Period, the City may <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.