Laserfiche WebLink
Ile°11;16*. <br /> CONSTRUCTION <br /> MANAGEMENT <br /> Date: 12/15/2014 <br /> Request For Change Order (RCO) #6 <br /> Project: Sunny Isles Beach —Arlen House # 142911 <br /> Scope: <br /> Meter Boxes <br /> 1. Remove existing meter boxes. <br /> 2. Provide and install (6) six new precast concrete Meter Boxes with steel access cover. <br /> 3. Delivery of materials to site. <br /> Description Unit Quantity Unit Cost Total <br /> Demolition&removal LS 1 $500.00 $500.00 <br /> Meter Boxes Material EA 6 $135.00 $810.00 <br /> Delivery LS 1 $150.00 $150.00 <br /> Install labor DAY 1 $350.00 $350.00 <br /> Subtotal $1,810.00 <br /> 15%OH&P $271.50 <br /> 1.2%Liability Insurance $0.00 <br /> 1.0%Bond $0.00 <br /> Total Change Order $2,081.50 <br /> GC reserves the right to request an equitable time extension for rescheduling delays, disruption, <br /> acceleration and/or impact in the event this modification changes the construction sequence <br /> and/or time of completion. <br /> The total amount of this change order request is: $2,081.50 <br /> Acceptance to this proposal will enable Contractor to incorporate into prime contract. <br /> SUBMITTED BY: APPROVED BY: <br /> Brian Shirley <br /> Lynx Construction Management, LLC. Date Accepted to Proceed <br />