My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2251
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2015 3:32:27 PM
Creation date
7/7/2014 3:35:53 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2251
Date (mm/dd/yyyy)
06/19/2014
Description
Awd Bid 14-04-01/Agmt w/Lynx Construction: Arlen House Right-of-Way Improvemts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the Agreement. <br />Contract Time means the time period defined in this Agreement for the Contractor to <br />complete the Work. <br />Contractor means the Successful Contractor selected by the City to provide all labor, materials, <br />equipment and services to complete the Work described in the Contract Documents. <br />Contractor Project Manager means the person designated by Contractor as its lead <br />representative to the City. The Contractor Project Manager shall have the authority to obligate <br />and bind the Contractor and to act on all matters on behalf of Contractor except for revisions to <br />the Contract Documents and Change Orders. <br />Construction Change Directive means a written directive to effect changes to the Work, <br />prepared by and executed by the City. <br />Construction Work means all Work required by this Agreement for the construction of the <br />Project. The Construction Work is also referred to herein as the "Work ". <br />Cure means the action taken by the Contractor, promptly after receipt of written notice from the <br />City of a breach of the Agreement, which shall be performed at no cost to the City, to repair, <br />replace, correct, and/or remedy all material, equipment, or other elements of the Work or the <br />Agreement affected by such breach, or to otherwise make good and eliminate such breach, <br />including, without limitation, repairing, replacing or correcting any portion of the Work or the <br />Project site disturbed in performing such cure. <br />Cure Period means a period of seven (7) days, after receipt of written notice to cure from the <br />City, in which the Contractor is required to cure deficiencies in the Work or compliance with <br />this Agreement or the Contract Documents. <br />Drawings means the graphic and pictorial portions of the Work, which serve to show the <br />design, location and dimensions of the Work to be performed, including, without limitation, all <br />notes, schedules and legends on such Drawings. <br />Field Directive means a written approval for the Contractor to proceed with Work requested by <br />the City, which is minor in nature and should not involve additional cost. <br />Insurance Requirements means the requirements described in this Agreement and the Contract <br />Documents. <br />Notice To Proceed means a written letter or directive issued by the City Manager or his <br />designee directing that the Contractor may begin Work on the Project or a specific task of the <br />Project. <br />Project Manager means an employee or representative of the City assigned to manage and <br />monitor the Work to be performed under this Agreement and the construction of the Project. <br />Project means the construction and incidentals thereto, of the project entitled RFP 14 -04 -01 <br />"Arlen House Right -of -Way Improvement ", as described in the Contract Documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.