Laserfiche WebLink
Project Site means the area for the proposed Project, consisting of Arlen House Right -of -Way <br />Improvements along the frontage of Arlen House property extending from the south side of <br />Bayview Drive to the southern terminus of the property on Collins Avenue (SR AIA). <br />Punch List means a compilation of items of Construction Work required to be performed by, or <br />through the Contractor after the Substantial Completion inspection and prior to Final Completion <br />and payment. <br />Request For Information (RFI) means a request from the Contractor seeking an interpretation <br />or clarification by the City relative to the Agreement and/or the Contract Documents. The RFI, <br />which shall be clearly marked RFI, shall clearly and concisely set forth the issue(s) or item(s) <br />requiring clarification or interpretation and why the response is needed. The RFI must set forth <br />the Contractor's interpretation or understanding of the document(s) in question, along with <br />the reason for such understanding. <br />Schedule of Values means a written schedule setting forth the detailed and itemized cost <br />breakdown, inclusive of labor, material, and taxes of all elements comprising the Work. <br />Specifications and Plans as used herein means that portion of the Contract Documents <br />which are the written requirements for the materials, equipment, systems, standards and <br />workmanship for completion of the Work and performance of related services for this Project. <br />Sub - Contractor(s) means a person or entity other than a materialman or laborer that has a <br />direct contract with the Contractor to perform or supply any portion of the Work in connection <br />with this Project. <br />Time for Completion means the time to complete all Work no later than six (6) months from <br />the Commencement Date specified in the Notice to Proceed issued by the City Manager or his <br />designee. <br />Final Completion means the date certified by the City Engineer that all documents required <br />by the Contract Documents have been received by the City Engineer; any other documents <br />required to be provided by Contractor have been received by City Engineer; and to the best <br />of City Engineer's knowledge, information and belief the Work defined herein has been fully <br />completed in accordance with the terms and conditions of the Contract Documents. <br />Work as used herein refers to all services required by the Contract Documents, including all <br />labor, materials, equipment, supervision and services needed to complete the Project in <br />accordance with the Contract Documents. <br />ARTICLE 1. SCOPE OF WORK <br />Contractor shall provide all labor, materials, equipment, tools, manpower, management, <br />supervision, and all other necessary goods and services to perform the Work in the manner <br />provided by this Agreement and the Contract Documents. <br />