My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2251
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2015 3:32:27 PM
Creation date
7/7/2014 3:35:53 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2251
Date (mm/dd/yyyy)
06/19/2014
Description
Awd Bid 14-04-01/Agmt w/Lynx Construction: Arlen House Right-of-Way Improvemts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Site means the area for the proposed Project, consisting of Arlen House Right -of -Way <br />Improvements along the frontage of Arlen House property extending from the south side of <br />Bayview Drive to the southern terminus of the property on Collins Avenue (SR AIA). <br />Punch List means a compilation of items of Construction Work required to be performed by, or <br />through the Contractor after the Substantial Completion inspection and prior to Final Completion <br />and payment. <br />Request For Information (RFI) means a request from the Contractor seeking an interpretation <br />or clarification by the City relative to the Agreement and/or the Contract Documents. The RFI, <br />which shall be clearly marked RFI, shall clearly and concisely set forth the issue(s) or item(s) <br />requiring clarification or interpretation and why the response is needed. The RFI must set forth <br />the Contractor's interpretation or understanding of the document(s) in question, along with <br />the reason for such understanding. <br />Schedule of Values means a written schedule setting forth the detailed and itemized cost <br />breakdown, inclusive of labor, material, and taxes of all elements comprising the Work. <br />Specifications and Plans as used herein means that portion of the Contract Documents <br />which are the written requirements for the materials, equipment, systems, standards and <br />workmanship for completion of the Work and performance of related services for this Project. <br />Sub - Contractor(s) means a person or entity other than a materialman or laborer that has a <br />direct contract with the Contractor to perform or supply any portion of the Work in connection <br />with this Project. <br />Time for Completion means the time to complete all Work no later than six (6) months from <br />the Commencement Date specified in the Notice to Proceed issued by the City Manager or his <br />designee. <br />Final Completion means the date certified by the City Engineer that all documents required <br />by the Contract Documents have been received by the City Engineer; any other documents <br />required to be provided by Contractor have been received by City Engineer; and to the best <br />of City Engineer's knowledge, information and belief the Work defined herein has been fully <br />completed in accordance with the terms and conditions of the Contract Documents. <br />Work as used herein refers to all services required by the Contract Documents, including all <br />labor, materials, equipment, supervision and services needed to complete the Project in <br />accordance with the Contract Documents. <br />ARTICLE 1. SCOPE OF WORK <br />Contractor shall provide all labor, materials, equipment, tools, manpower, management, <br />supervision, and all other necessary goods and services to perform the Work in the manner <br />provided by this Agreement and the Contract Documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.