My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />01020 - 3/11 <br /> <br />1.05 BASIS FOR PAYMENTS: The various items of Work will be paid for in the unit-amounts <br />per work item times units completed and accepted by Owner of work items listed in the Bid <br />Form. The sum of all separate payments shall not exceed the contract price. <br />A. Bid Item / Unit <br />Item 1: <br />Bonds and Insurance / LS: This item shall cover the costs for all necessary insurance <br />and bonds the Contractor must secure inlcuding submittal of all required documentation, <br />such as certificates. <br />Measurement for payment shall be lump sum based on the submittal of all bonds and <br />insurance documents. <br /> <br />Item 2: <br />Mobilization / LS: This item shall cover the costs for making available on the work site the <br />necessary temporary facilities and the necessary personnel, supplies, tools and <br />equipment to perform the work (heavy construction equipment, hand tools, storage, lay- <br />down yards, temporary and/or portable power supply, barricades, fence and safety <br />equipment, and all other items necessary to start the work); posting OSHA required <br />notices and establishment of safety programs; notifications to the affected public; <br />Contractor’s superintendent on site full-time. Demobilization shall be included in this item <br />and shall be part of ‘substantial completion’ and includes the removal of all tools and <br />equipment from site, the removal of all temporary facilities, the restoration of those areas <br />to original or better conditions that were used for temporary facilities. No additional <br />payments will be made for mobilization and demobilization activities due to shutdowns, <br />suspension of work, or other mobilization requirements. <br /> <br />Measurement for payment shall be based on the completion of the mobilization and all <br />other items, as described, to the satisfaction of the City and shall not be more than 5% of <br />the Total Bid. The lump sum amount for this bid item shall be distributed as follows: 60% at <br />the completion of mobilization requirements and 40% at substantial completion of the <br />work. <br /> <br />Item 3: <br />Maintenance of Traffic / Monthly : This item shall cover the costs for all labor, materials, <br />equipment needed to place and maintain all traffic controls needed to temporarily control <br />traffic away from the area of work for the duration of the project. This item s hall also <br />include preparation of documentation, exhibits, and processing of traffic control plan(s) for <br />approval through the City, the County and/or the Florida Department of Transportation as <br />required. Traffic control plans shall be in accordance with the Manual on Uniform Traffic <br />Control Devices (MUTCD) and the Florida Department of Transportation Standard Indexes <br />latest edition. <br />Measurement for payment shall be based on a monthly pro-rated amount throughout the <br />duration of the project. No additional payment shall be made for additional time exceeding <br />the project schedule specified in the bid documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.