Laserfiche WebLink
<br />City of Sunny Isles Beach | Invitation to Bid No. 21-08-01 20 <br /> <br />5. The work shall be conducted to maintain access to existing driveways at all <br />times. <br />B. Construction Schedule: The CONTRACTOR shall submit a proposed construction schedule, <br />clearly showing the sequence of the work on a street-by-street and block by block basis to the City <br />and the ENGINEER for their approval. Refer to Section 01310 Construction Schedules. <br /> <br /> <br /> <br />THIS SECTION INTENTIONALLY LEFT BLANK <br />END OF SECTION <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />