Laserfiche WebLink
<br />City of Sunny Isles Beach | Invitation to Bid No. 21-08-01 26 <br /> <br />Note: Some pay items are broken down into material and labor costs. The Sum of these two costs determines the total <br />unit costs. Total Unit Cost will be used to determine Base Price. Where material provided by others, material unit costs <br />to not apply. Cost that do not apply are marked "N/A". Cost included in Total Unit Cost are identified as "INCL". <br />PAY ITEM <br />Quantity Unit Labor Unit <br />Cost <br />Material <br />Unit Cost <br />Total Unit <br />Cost <br />(labor + <br />material) <br />Base Price <br />(total unit <br />cost x <br />quantity) PER 01020 <br /> <br />1 Bonds and Insurance 1 LS INCL INCL <br />2 Mobilization 1 LS INCL INCL <br />3 Maintenance of Traffic 18 MONTHLY INCL INCL <br />4 Testing, Surveying and <br />Miscellaneous 1 LS INCL INCL <br />5 Indemnification Allowance 1 LS N/A N/A $100 $100 <br /> SUBTOTAL DIVISION 1 <br /> <br /> <br />6 <br />Install only one(1)-6 inch PVC <br />schedule 40 conduit bundled in <br />one main trench with others for <br />FPL Utility (FPL to furnish <br />material) <br />1,374 LF N/A <br />7 <br />Install only two (2)-6 inch PVC <br />schedule 40 conduit bundled in <br />one main trench with others for <br />FPL Utility (FPL to furnish <br />material) <br />172 LF N/A <br />8 <br />Install only three (3)-6 inch PVC <br />schedule 40 conduit bundled in <br />one main trench with others for <br />FPL Utility (FPL to furnish <br />material) <br />20 LF N/A <br /> <br /> <br />