My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | Invitation to Bid No. 21-08-01 26 <br /> <br />Note: Some pay items are broken down into material and labor costs. The Sum of these two costs determines the total <br />unit costs. Total Unit Cost will be used to determine Base Price. Where material provided by others, material unit costs <br />to not apply. Cost that do not apply are marked "N/A". Cost included in Total Unit Cost are identified as "INCL". <br />PAY ITEM <br />Quantity Unit Labor Unit <br />Cost <br />Material <br />Unit Cost <br />Total Unit <br />Cost <br />(labor + <br />material) <br />Base Price <br />(total unit <br />cost x <br />quantity) PER 01020 <br /> <br />1 Bonds and Insurance 1 LS INCL INCL <br />2 Mobilization 1 LS INCL INCL <br />3 Maintenance of Traffic 18 MONTHLY INCL INCL <br />4 Testing, Surveying and <br />Miscellaneous 1 LS INCL INCL <br />5 Indemnification Allowance 1 LS N/A N/A $100 $100 <br /> SUBTOTAL DIVISION 1 <br /> <br /> <br />6 <br />Install only one(1)-6 inch PVC <br />schedule 40 conduit bundled in <br />one main trench with others for <br />FPL Utility (FPL to furnish <br />material) <br />1,374 LF N/A <br />7 <br />Install only two (2)-6 inch PVC <br />schedule 40 conduit bundled in <br />one main trench with others for <br />FPL Utility (FPL to furnish <br />material) <br />172 LF N/A <br />8 <br />Install only three (3)-6 inch PVC <br />schedule 40 conduit bundled in <br />one main trench with others for <br />FPL Utility (FPL to furnish <br />material) <br />20 LF N/A <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.