My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | Invitation to Bid No. 21-08-01 27 <br /> <br />PAY ITEM <br />Quantity Unit Labor Unit <br />Cost <br />Material <br />Unit Cost <br />Total Unit <br />Cost <br />(labor + <br />material) <br />Base Price <br />(total unit <br />cost x <br />quantity) PER 01020 <br />9 <br />Install only one (1)-2 inch PVC <br />schedule 40 conduit bundled in <br />one main trench with others for <br />FPL Utility (FPL to furnish <br />material) <br />1,085 LF N/A <br />10 <br />Install only two (2)-2 inch PVC <br />schedule 40 conduit bundled in <br />one main trench with others for <br />FPL Utility (FPL to furnish <br />material) <br />2,126 LF N/A <br />11 <br />Install only three (3)-2 inch PVC <br />schedule 40 conduit bundled in <br />one main trench with others for <br />FPL Utility (FPL to furnish <br />material) <br />10,853 LF N/A <br />12 <br />Install only four (4)-2 inch PVC <br />schedule 40 conduit bundled in <br />one main trench with others for <br />FPL Utility (FPL to furnish <br />material) <br />23 LF N/A <br />13 <br />Install only six (6)-2 inch PVC <br />schedule 40 conduit bundled in <br />one main trench with others for <br />FPL Utility (FPL to furnish <br />material) <br />70 LF N/A <br />14 <br />Install only nine (9)-2 inch PVC <br />schedule 40 conduit bundled in <br />one main trench with others for <br />FPL Utility (FPL to furnish <br />material) <br />135 LF N/A <br />15 <br />Install only feeder splice box for <br />FPL Utility (FPL to furnish <br />material) <br />4 EA N/A <br />16 <br />Install only concrete pad for vista <br />switch cabinets for FPL Utility <br />(FPL to furnish material) <br />2 EA N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.