My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />00700 - 23/38 <br />claim for an adjustment in the Contract Price will be valid if not submitted in <br />accordance with this Paragraph 11.1B. <br /> <br />C. The value of any Work covered by a Change Order or of any claim for an <br />increase or decrease in the Contract Price shall be determined in one of the <br />following ways: <br /> <br />1. Where the Work involved is covered by unit prices contained in the <br />Contract Documents, by application of unit prices to the quantities of the <br />items involved. <br /> <br />2. By mutual acceptance of a lump sum, which may include an allowance for <br />overhead and profit not necessarily in accordance with Paragraph 11.4. <br /> <br />3. On the basis of the cost of Work (determined as provided in Paragraphs <br />11.2 and 11.3) plus a CONTRACTOR's fee for overhead and profit <br />(determined as provided in Paragraph 11.4). <br /> <br />11.2 COST OF WORK for CHANGE ORDERS (BASED ON TIME AND MATERIALS) <br /> <br />A. General: The term "cost of Work" means the sum of all costs necessarily <br />incurred and paid by the CONTRACTOR for labor, materials, and equipment in <br />the proper performance of extra Work. Except as otherwise may be agreed to in <br />writing by the OWNER, such costs shall be in amounts no higher than those <br />prevailing in the locality of the Project. Whenever any extra Work is in progress, <br />for which the definite price has not been agreed on in advance, the <br />CONTRACTOR shall each day, report to the ENGINEER the amount and cost of <br />the labor and material used, and any other expense incurred in such extra Work <br />on the preceding day, and no claim for compensation for such extra Work will be <br />allowed unless such report shall have been made. <br /> <br />B. Labor: The cost of labor used in performing extra Work by the CONTRACTOR, a <br />subcontractor, or other forces will be the sum of the following: <br /> <br />1. The actual wages paid plus any employer payments to, or on behalf of <br />workers for fringe benefits including health and welfare, pension, <br />vacation, and similar purposes. The cost of labor may include the wages <br />paid to foremen when determined by the ENGINEER that the services of <br />foremen do not constitute a part of the overhead allowance. <br /> <br />2. All payment imposed by state and federal laws including, but not limited <br />to, compensation insurance, and social security payments. <br /> <br />3. The amount paid for subsistence and travel required by collective <br />bargaining agreements, or in accordance with the regular practice of the <br />employer. <br /> <br />4. At the beginning of the extra Work and as later requested by the <br />ENGINEER, the CONTRACTOR shall furnish the ENGINEER proof of <br />labor compensation rates being paid. <br />