My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
ITB 21-08-01 Utility Undergrounding Golden Shores (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 10:14:46 AM
Creation date
9/1/2021 10:11:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Utility Undergrounding Conversion for Golden Shores
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />00700 - 24/38 <br />C. Materials: The cost of materials used in performing extra Work will be the cost to <br />the purchaser, whether CONTRACTOR or subcontractor, from the supplier <br />thereof, except as the following are applicable: <br /> <br />1. Trade discounts available to the purchaser shall be credited to the <br />OWNER notwithstanding the fact that such discounts may not have been <br />taken by the CONTRACTOR. <br /> <br />2. For materials secured by other than a direct purchase and direct billing to <br />the purchaser, the cost shall be deemed to be the price paid to the actual <br />supplier as determined by the ENGINEER. Markup except for actual <br />costs incurred in the handling of such materials will not be allowed. <br /> <br />3. Payment for materials from sources owned wholly or in part by the <br />purchaser shall not exceed the price paid by the purchaser for similar <br />materials from said sources on extra Work items or the current wholesale <br />price for such materials delivered to the Work site, whichever price is <br />lower. <br /> <br />4. If in the opinion of the ENGINEER the cost of material is excessive, or the <br />CONTRACTOR does not furnish satisfactory evidence of the cost of such <br />material, then the cost shall be deemed to be the lowest current <br />wholesale price for the quantity concerned delivered to the Work site less <br />trade discount. The OWNER reserves the right to furnish materials for <br />the extra Work and no claim shall be made by the CONTRACTOR for <br />costs and profit on such materials. <br /> <br />D. Equipment: The CONTRACTOR will be paid for the use of equipment as stated <br />in the latest edition of the "Compilation of Rental Rates for Construction <br />Equipment" by Associated Equipment Distributors. Such rental rate will be used <br />to compute payments for equipment whether the equipment is under the <br />CONTRACTOR's control through direct ownership, leasing, renting, or another <br />method of acquisition. The rental rate to be applied for use of each item of <br />equipment shall be the rate resulting in the least total cost to the OWNER for the <br />total period of use. The CONTRACTOR may furnish cost data which might assist <br />the ENGINEER in the establishment of the rental rate. <br /> <br />1. All equipment shall, in the opinion of the ENGINEER, be in good working <br />condition and suitable for the purpose for which the equipment is to be <br />used. <br /> <br />2. Before construction equipment is used on the extra Work, the <br />CONTRACTOR shall plainly stencil or stamp an identifying number <br />thereon at a conspicuous location, and shall furnish to the ENGINEER, in <br />duplicate, a description of the equipment and its identifying number. <br /> <br />3. Unless otherwise specified, manufacturer's ratings and manufacturer <br />approved modifications shall be used to classify equipment for the <br />determination of applicable rental rates. Equipment which has no direct <br />power unit shall be powered by a unit of at least the minimum rating <br />recommended by the manufacturer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.