My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2021-3244
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2021
>
Reso 2021-3244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2021 11:16:30 AM
Creation date
9/24/2021 11:15:11 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2021-3244
Date (mm/dd/yyyy)
09/14/2021
Description
Change Order #9 with Nunez Construction, Inc for Gateway Park Center Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C O N S T R U C T I O N <br />Proposal #; 210817-1 <br />To: Richard Labinsky Date: August 17 2021 <br />Company: City of Sunny Isles Blvd. Sob: Gateway Park. SIBFL. <br />Address: 18070 Collins Ave SIBFL. Re: Waterproofing /Sealant 2-3 floors <br />Notes: <br />Scope of work included remove, clean and prep existing epansion joint in second and third floors. Materials: <br />Dynominc 100, Tremco Vulken 351, backer rod, Tremco Vulken 350 nf, xylene, Tremco vulken 191 primer. <br />Plumbing: Rough and set 6 floor drains. PVC lines tien into existing roof drain. One Year Warranty Labor <br />
The URL can be used to link to this page
Your browser does not support the video tag.