My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2021-3244
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2021
>
Reso 2021-3244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2021 11:16:30 AM
Creation date
9/24/2021 11:15:11 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2021-3244
Date (mm/dd/yyyy)
09/14/2021
Description
Change Order #9 with Nunez Construction, Inc for Gateway Park Center Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R F FLL}QS' 4 <br />T} OF SWC* h <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 City Hall <br />(305) 949-3113 Fax <br />MEMORANDUM <br />TO: Honorable Mayor and City Commissioners <br />VIA: Christopher J. Russo, City Manager <br />FROM: Richard Labinsky, P.E., City Engineer <br />DATE: September 14, 2021 <br />RE: Approval of Change Order No. 9 with Nunez Construction for the Gatewa), <br />Park Project <br />RECOMMENDATION: <br />Staff recommends approval of this Resolution. <br />REASONS: <br />The City of Sunny Isles Beach desires Nunez Construction to provide additional services at the Gatewa, <br />Park Center parking garage. The parking garage needs repairs to the existing expansion joints. <br />Additional floor drains are also needed. <br />The additional work breakdown is as follows: <br />• Waterproofing and sealing of expansion joints at the second and third floors. The general <br />requirement including supervision, scan, core drilling, insurances, cleaning and protection: <br />$9,500.00 <br />• Removal, cleaning and apply new sealant in existing expansion joints: $16,880.00 <br />• Provide and install six floor drains in the second and third floors. PVC rough fie into existing roof <br />drain in each floor: $14,800.00 <br />• 0&P: $6,177.00 <br />For a total not to exceed $47,357.00 <br />FUNDING SOURCE: <br />Item Number: 10.S <br />
The URL can be used to link to this page
Your browser does not support the video tag.