My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AUM Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
Responses
>
AUM Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 4:28:21 PM
Creation date
9/28/2021 4:19:22 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Utility Undergrounding
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q. On Swale areas , the Contractor can backfill the trench with the same existing material or <br />does it have to be replaced with suitable fill ? <br />A. "SUITABLE FILL" IS ALWAYS REQUIRED. <br />Q. The use of Spacers for the conduits is mandatory ? <br />A. BETWEEN FPL AND OTHER UTILITIES —SEE ADENDUM # 1 <br />Q. If the Duct Bank goes through the existing lateral sewer the solution is not a repair lateral, <br />the lateral has to be relocated . Please advise. <br />A. ADJUSTMENT OF CONDUIT HEIGHT WILL BE ADDRESSED ON A CASE BY CASE SITUATION. <br />Q. It is the same case for the Water Services. Please advise. <br />A. ADJUSTMENT OF CONDUIT HEIGHT WILL BE ADDRESSED ON A CASE BY CASE SITUATION <br />Q. Can the City add an item for Striping (Paint and Thermoplastic) after Milling &Resurfacing? <br />A. NO INCLUSIVE WITH BID LINE ITEM 39 <br />Q. Is the Temporary Asphalt required? <br />A. SEE ADDENDUM # 1 <br />Q. Can we place milling material instead of laying temporary asphalt for the trench? <br />END ADDENDUM # 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.