My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ferreira Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
Responses
>
Ferreira Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 4:57:31 PM
Creation date
9/28/2021 4:54:52 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Utility Undergrounding
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FERREfRA <br />of underground utilities in Miami -Dade. Ferreira will also utilize top quality materials on the project purchased from <br />reputable vendors with whom we have repeatedly partnered on other projects. <br />We have included three tables in our Proposal that will provide the City a snap picture of our past experience, our FPL <br />projects and our projects at hand. All these projects have provided Ferreira an unmatched resume of relevant <br />experience that include the installation of underground utilities of all types that required the coordination with <br />numerous utility owners, that involved detailed planning and accelerated construction in highly urban areas in Miami - <br />Dade, and that provide our personnel the know-how required to build this Project. <br />Timely Completion. Ferreira understands what it takes to complete a project within specific timeframes required by our <br />clients. We have never been issued liquidated damages on any of our projects, a testament to the level of planning and <br />execution of our project personnel. With the City's project goals in mind, we will develop a CPM schedule with project <br />milestones that will be monitored weekly by our project management team and that will be updated as required by the <br />contract documents. Ferreira will work with the City as needed to adjust, amend, or implement any milestones to <br />complete the project ahead of time. In addition, we utilize two-week-look-aheads that are developed weekly by our <br />project manager and superintendent in order to coordinate the work and inform all project stake holders of the ongoing <br />progress of the work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.