Laserfiche WebLink
>FERREIRA <br />Proposed Work Plan <br />Upon award, Ferreira will develop a Work Plan for the Project that will focus on <br />four points: <br />1. Safety <br />2. Public Welfare <br />3. Quality <br />4. Timely Completion <br />Safety. Ferreira holds Safety as our number one priority in everything that we do. <br />In order to complete this project while maintaining the highest standard of safety <br />on the job, Ferreira will implement the following safety guidelines that will be <br />incorporated in a project specific Safety Plan that will be presented upon contract <br />award: <br />Figure 2 - Duct Bank Installation at <br />Sevilla Ave Project in Coral Gables, for <br />FPL <br />• A Job Safety Briefing (JSB) will be conducted every morning to establish <br />daily risks and allow all project personnel to discuss any safety concern. <br />• Certified traffic safety personnel will be assigned to the job to periodically inspect and ensure that local traffic is <br />safely circulating. <br />• Ferreira's Safety Manager will periodically visit the Project to ensure strict adherence to our Safety Plan <br />• Each crew will have an assigned Safety Champion, who will assist each foreman in the adherence of our safety <br />guidelines. <br />• Equipment will be checked daily to ensure its safe and efficient performance including the prevention of leaks <br />and oil spills. <br />• A Safety Kickoff Meeting will be conducted prior to the start of any construction. All project personnel will <br />participate. All project stakeholders and City representatives are welcomed to attend. <br />Public Welfare. Ferreira understands that the Project is located in a high-profile residential area and that utmost care <br />must be taken by the Contractor to ensure the work is performed with the safety, <br />integrity, and welfare of the Public and residents always in mind. Our experience <br />working in the installation of duct banks in similar project environments will be an <br />invaluable asset to the City in meeting its project goals. Our maintenance of traffic <br />supervisors, safety manager, and project superintendent will make certain that our <br />Maintenance of Traffic patterns take into consideration local traffic needs and that it <br />meets MUTCD standards. Emergency vehicles will be allowed to pass by without any <br />interference of our work, even if the work needs to stop temporarily to allow it. <br />Figure 3 - Duct Bank Installation at <br />Valencia A Project for FPL <br />Ferreira will also focus on pedestrian safety by utilizing safety devices to delineate the <br />work zones, maintaining sidewalk usage, and doing daily checks so that no open <br />trenches are left unsafe. <br />Quality. Over the course of the last 5 years, Ferreira has performed for numerous <br />local agencies gaining the reputation of an integral and safe contractor. Our goal is to <br />complete our work right the first time. For this purpose, we assign work crews and <br />supervisors that have the proper experience to complete the work at hand. On this <br />project, we will assign only personnel that has extensive experience in the installation <br />