My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ferreira Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
Responses
>
Ferreira Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 4:57:31 PM
Creation date
9/28/2021 4:54:52 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Utility Undergrounding
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID FORM revised <br />Note: Some pay Items are broken down into material and labor costs. The Sum of these two costs determines the total <br />unit costs. Total Unit Cost will be used to determine Base Price. Where material provided by others, material unit costs to not <br />apply. Cost that do not apply are marked "N/A". Cost included in Total Unit Cost are identified as 'INCL". <br />Base Price (total <br />unit cost x <br />quantity) �J <br />1 <br />Bonds and Insurance <br />1 <br />LS <br />INCL <br />INCL <br />$ <br />90,000.00 <br />$ <br />90,000.00 <br />2 <br />Mobilization <br />1 <br />LS <br />INCL <br />INCL <br />$ <br />300,000.00 <br />$ <br />300,000.00 <br />3 <br />Maintenance of Traffic <br />18 <br />MONTHLY <br />INCL <br />INCL <br />$ <br />15,000.00 <br />$ <br />270,000.00 <br />4 <br />Testing, Surveying and <br />Miscellaneous <br />1 <br />LS <br />INCL <br />INCL <br />$ <br />210,000.00 <br />$ <br />210,000.00 <br />5 <br />Indemnification Allowance <br />1 <br />LS <br />N/A <br />N/A <br />$ <br />100.00 <br />$ <br />100.00 <br />SUBTOTAL DIVISION 1 <br />$ <br />870,100.00 <br />schedule 40 conduit bundled in one <br />Install only one(1)-6 inch PVC <br />schedule 40 conduit bundled in one <br />6 <br />main trench with others for FPL <br />1,374 <br />LF <br />$ 9.00 <br />N/A <br />!i <br />$ 9.00 <br />$ <br />12,366.00 <br />Utility (FPL to furnish material) <br />install only two (2)-6 inch PVC <br />schedule 40 conduit bundled in one <br />7 <br />main trench with others for FPL <br />172 <br />LF <br />$ 9.00 <br />N/A <br />$ 9.00 <br />$ <br />1,548.00 <br />Utility (FPL to furnish material) <br />install only three (3)-6 inch PVC <br />! <br />schedule 40 conduit bundled in one <br />S <br />8 <br />main trench with others for FPL <br />20 <br />LF <br />$ 18.00 <br />N/A <br />$ 18.00 <br />$ <br />360.00 <br />Utility (FPL to furnish material) <br />I <br />Total Unit <br />Base Price (total <br />Quantity <br />Unit <br />Labor Unit <br />Material <br />Cost (labor + <br />unit cost x <br />Cost <br />Unit Cost <br />material) <br />quantity) <br />Install only one (1)-2 inch PVC <br />schedule 40 condu!t bundled in one <br />+T <br />9 <br />main trench with others for FPL <br />1,085 <br />LF <br />$ 3.001 <br />N/A <br />$ 3.00 <br />$ <br />3,255.00 <br />Utility (FPL to furnish material) <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.