My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ferreira Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
Responses
>
Ferreira Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 4:57:31 PM
Creation date
9/28/2021 4:54:52 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Utility Undergrounding
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quantity <br />P17Install <br />Install only two (2)-2 inch PVC <br />Labor Unit <br />Cost <br />Material <br />Unit Cost <br />Total Unit <br />Cost (labor + <br />material) <br />i Base Price (total <br />unit cost x <br />quantity) <br />y <br />only 50" splice box for FPL 6 <br />EA <br />Utility (FPL to furnish material) <br />schedule 40 conduit bundled in one <br />$ 2,100.00 <br />N/A <br />$ 2,100.00 <br />10 <br />main trench with others for FPL <br />2,126 <br />LF <br />$ <br />4.00 <br />N/A <br />$ <br />4.00 <br />$ <br />8,504.00 <br />$ 1,000.00 <br />Utility (FPL to furnish material) <br />Install only concrete pad for <br />transformers for FPL Utility (FPL to <br />19 furnish material) 62 <br />EA <br />$ 1,500.00 <br />Install only three (3)-2 inch PVC <br />$ 1,500.00 <br />$ 93,000.00 <br />schedule 40 conduit bundled in one <br />11 <br />main trench with others for FPL <br />10,853 <br />LF <br />$ <br />4.00 <br />N/A <br />$ <br />4.00 <br />$ <br />43,412.00 <br />Utility (FPL to furnish material) <br />Install only four (4)-2 inch PVC <br />schedule 40 conduit bundled in one <br />12 <br />main trench with others for FPL <br />23 <br />LF <br />$ <br />16.00 <br />N/A <br />$ <br />16.00 <br />$ <br />368.00 <br />Utility (FPL to furnish material) <br />Install only six (6)-2 inch PVC <br />schedule 40 conduit bundled in one <br />13 <br />main trench with others for FPL <br />70 <br />LF <br />$ <br />5.00 <br />N/A <br />$ <br />5.00 <br />$ <br />350.00 <br />Utility (FPL to furnish material) <br />i <br />Install only nine (9)-2 inch PVC <br />schedule 40 conduit bundled in one <br />14 <br />main trench with others for FPL <br />135 <br />LF <br />$ <br />5.00 <br />N/A <br />$ <br />5.00. <br />$ <br />675.00 <br />Utility (FPL to furnish material) <br />15 <br />Install only feeder splice box for <br />4 <br />EA <br />FPL Utility (FPL to furnish <br />material) <br />$ <br />2,000.00 <br />N/A <br />$ <br />2,000.00 <br />$ <br />8,000.00 <br />16 <br />Install only concrete pad for vista <br />2 <br />EA <br />switch cabinets for FPL Utility (FPL <br />to furnish material) <br />$ <br />4,000.00 <br />N/A <br />$ <br />4,000.00 <br />$ <br />8,000.00 <br />Quantity <br />P17Install <br />Unit <br />Labor Unit <br />Cost <br />Material <br />Unit Cost <br />Total Unit <br />Cost (labor + <br />material) <br />i Base Price (total <br />unit cost x <br />quantity) <br />y <br />only 50" splice box for FPL 6 <br />EA <br />Utility (FPL to furnish material) <br />$ 2,100.00 <br />N/A <br />$ 2,100.00 <br />$ 12,600.00 <br />I <br />18 Install only 30"handhole for FPL 26 <br />EA <br />Utility (FPL to furnish material) <br />$ 1,000.00 <br />N/A <br />$ 1,000.00 <br />$ 26,000.00 <br />Install only concrete pad for <br />transformers for FPL Utility (FPL to <br />19 furnish material) 62 <br />EA <br />$ 1,500.00 <br />N/A <br />$ 1,500.00 <br />$ 93,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.