My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ferreira Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
Responses
>
Ferreira Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2021 4:57:31 PM
Creation date
9/28/2021 4:54:52 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Utility Undergrounding
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
120 <br />Install only 18"x24" service pull <br />21.80 <br />4 inch PVC schedule 40 conduit <br />I <br />bundled in one main trench with 7 <br />I <br />f <br />boxes for FPL Utility (FPL to <br />Supply and install only two (2)-4 <br />$ 49.80 <br />inch PVC schedule 40 conduit <br />26 <br />furnish material) <br />238 <br />EA <br />$ 1,000.00 N/A <br />$ 1,000.00 <br />$ 238,000.00 <br />Supply and install only four (4)- <br />Supply and install only two (2)-4 <br />4 inch PVC schedule 40 conduit <br />i <br />27 <br />bundled in one main trench with <br />1,741 <br />inch PVC schedule 40 conduit <br />Supply and install only six (6)-4 inch <br />PVC schedule 40 conduit bundled in <br />21 <br />bundled in one main trench with <br />3,125 <br />LF <br />$ 13.40 <br />$ 16.60 <br />$ 30.00 <br />$ 93,750.00 <br />others for Atlantic Broadband <br />Supply and install only four (4)- <br />4 inch PVC schedule 40 conduit <br />22 <br />bundled in one main trench with <br />4,797 <br />LF <br />$ 21.80 <br />$ 33.20 <br />$ 55.00 <br />$ 263,835.00 <br />others for Atlantic Broadband <br />Supply and install only six (6)-4 inch <br />PVC schedule 40 conduit bundled in <br />23 <br />one main trench with others for <br />350 <br />LF <br />$ 40.20 <br />$ 49.80 <br />$ 90.00 <br />$ 31,500.00 <br />Atlantic Broadband <br />Supply and install only eight (8)- <br />4 inch PVC schedule 40 conduit <br />24 <br />bundled in one main trench with <br />10 <br />LF <br />$ 53.60 <br />$ 66.40 <br />$ 120.00 <br />$ 1,200.00 <br />others for Atlantic Broadband <br />f ' <br />I, <br />Labor Unit Material Total Unit Base Price (total <br />Quantity Unit Cost Unit Cost Cost (labor + unit cost x <br />material) quantity) <br />LF j $ 80.401 $ 99.601 $ 180.00 $ 1,260.00 <br />I <br />LF $ 13.401 $ 16.60 $ 30.00 $ 267,630.00 <br />LF <br />Supply and install only twelve (12 )- <br />21.80 <br />4 inch PVC schedule 40 conduit <br />25 <br />bundled in one main trench with 7 <br />55.00 $ <br />90.001 $ <br />others for Atlantic Broadband <br />LF <br />Supply and install only two (2)-4 <br />$ 49.80 <br />inch PVC schedule 40 conduit <br />26 <br />bundled in one main trench with <br />8,921 <br />others for AT&T <br />Supply and install only four (4)- <br />4 inch PVC schedule 40 conduit <br />27 <br />bundled in one main trench with <br />1,741 <br />others for AT&T <br />Supply and install only six (6)-4 inch <br />PVC schedule 40 conduit bundled in <br />28 <br />one main trench with others for <br />213 <br />L_ <br />AT&T <br />_ ____ <br />- <br />LF j $ 80.401 $ 99.601 $ 180.00 $ 1,260.00 <br />I <br />LF $ 13.401 $ 16.60 $ 30.00 $ 267,630.00 <br />LF <br />$ <br />21.80 <br />$ <br />33.20 <br />$ <br />$ <br />55.00 $ <br />90.001 $ <br />95,755.00 <br />19,170.00 <br />LF <br />$ 40.20 <br />$ 49.80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.