Laserfiche WebLink
Supply and install only one (1)-2 <br />Total Unit <br />Base Price (total <br />inch PVC schedule 40 conduit <br />Quantity <br />Unit <br />Labor Unit Material <br />Cost (labor + <br />unit cost x <br />29 <br />bundled in one main trench with <br />6,330 <br />LF $ 4.86 <br />$ 3.14 <br />$ 8.00 <br />$ 50,640.00 <br />others for AT&T <br />Supply and install only two (2)-2 <br />2 inch PVC schedule 40 conduit <br />inch PVC schedule 40 conduit <br />bundled in one main trench <br />10,944 <br />LF <br />$ 19.44 <br />$ 12.56 <br />$ 32.00 <br />30 <br />bundled in one main trench with <br />3,208 <br />LF <br />$ 9.72 <br />$ 6.28 <br />$ 16.00 <br />$ 51,328.00 <br />others for AT&T <br />Supply and install only eight (8)- <br />j <br />31 <br />Supply and install only 10"x 15" <br />84 <br />EA <br />handhole for AT&T <br />bundled in one main trench <br />358 <br />$ 1,200.00 <br />$ 300.00 <br />$ 1,500.00 <br />$ 126,000.00 <br />32 <br />Supply and install only 17"x 30" <br />48 <br />EA <br />handhole for AT&T <br />Supply and install only <br />20 <br />$ 1,408.00 <br />$ 392.00 <br />$ 1,800.00 <br />$ 86,400.00 <br />33 <br />Supply and install only 30"x <br />16 <br />EA <br />$ 1,255.00 <br />$ 245.00 <br />$ 1,500.00 <br />$ 30,000.00 <br />48"x36" handhole for AT&T <br />conduit <br />$ 2,180.00 <br />$ 1,020.00 <br />$ 3,200.00 <br />$ 51,200.00 <br />Supply and install only two (2)- <br />F1owable Fill <br />97,125 <br />CF <br />INCL. <br />INCL. <br />2 -inch PVC schedule 40 conduit <br />$ 15.00 <br />34 <br />bundled in one main trench <br />293 <br />LF <br />$ 9.72 <br />$ 6.28 <br />$ 16.00 <br />$ 4,688.00 <br />$ 691,660.00 <br />with others for City conduit <br />Construct Concrete Sidewalk <br />1 <br />ALLOWANCE <br />INCL. <br />INCL. <br />$ 375,000.00 <br />Total Unit <br />Base Price (total <br />Quantity <br />Unit <br />Labor Unit Material <br />Cost (labor + <br />unit cost x <br />Cost Unit Cost <br />material) <br />quantity) <br />Supply and install only four (4)- <br />2 inch PVC schedule 40 conduit <br />35 <br />bundled in one main trench <br />10,944 <br />LF <br />$ 19.44 <br />$ 12.56 <br />$ 32.00 <br />$ 350,208.00 <br />with others for City conduit <br />-- <br />Supply and install only eight (8)- <br />j <br />2 inch PVC schedule 40 conduit <br />36 <br />bundled in one main trench <br />358 <br />LF <br />$ 38.88 <br />$ 25.12 <br />$ 64.00 <br />$ 22,912.00 <br />with others for City conduit <br />37 <br />Supply and install only <br />20 <br />EA <br />24"X13"X12" pull box for City <br />$ 1,255.00 <br />$ 245.00 <br />$ 1,500.00 <br />$ 30,000.00 <br />conduit <br />38 <br />F1owable Fill <br />97,125 <br />CF <br />INCL. <br />INCL. <br />$ 15.00 <br />$ 1,456,875.00 <br />39 <br />Asphalt Mill & Resurface <br />34,583 <br />SY <br />INCL. <br />INCL. <br />$ 20.00 <br />$ 691,660.00 <br />40 <br />Construct Concrete Sidewalk <br />1 <br />ALLOWANCE <br />INCL. <br />INCL. <br />$ 375,000.00 <br />$ 375,000.00 <br />41 <br />Urban Walkway <br />1 <br />ALLOWANCE <br />INCL. <br />INCL. <br />$ 250,000.00 <br />$ 250,000.00 <br />42 <br />Concrete fill over FPL conduits <br />1 <br />ALLOWANCE <br />INCL. <br />INCL. <br />$ 15,000.00 <br />$ 15,000.00 <br />43 <br />CONTINGENCY <br />1 <br />ALLOWANCE <br />N/A <br />N/A <br />$ 375,000.00 <br />$ 375,000.00 <br />