Laserfiche WebLink
FPL PROJECTS INCLUDING DUCT BANK <br />Job Name <br />Owner <br />Address of Owner <br />PeoumcfCamost/phone M/Ercall <br />Add—.fJob <br />C.—Valu. <br />Da ... R lon.1Work <br />Status Complete <br />Data Component <br />The Workto be performed underthb Comas Includes, but Is not <br />Ilmbetlta, the following: (I) Installation of nine (9) Biscayne Aqu-der <br />recovery wells (RW I atthe Sfte. (2) A minimum oftwo recovery <br />FPL•PTNCRPTurkey Palm Biscayne Aquifer Recovery Well <br />700 Universe Blvd, Jun, <br />Mr.,; Lula Gamla(Comma <br />(561)904-3641;(941) <br />Raul Febre@fol lue.Gamia@fits, <br />0760 SW 344th St Florida City; Turkey Peim <br />$ 1],433,140.00 <br />walls shall be installed at one time, requiring the use of multiple drill <br />Completed <br />100% <br />Sep -15 <br />— <br />System <br />FPL <br />Beach, FL 33408 <br />Sepclall#) <br />483.2069 <br />N..I—Pians <br />rigs. (3) Preparation of a geologic log. 14) Bore hole geophysical <br />logging. (5) Development and testing of each recovery wall. (6) <br />Survey of each redwery well site to include tap of casing and well <br />pad elevation. (7) Sha closeout activities. <br />Project rons of edegnofa Ca#in[,ace ll ator <br />FPL -Turkey Point Bay 11 Turkey Point Oil y Water Separator <br />FPL <br />700 Universe Blvd, Juno <br />Raul Feba; Luk Garcia <br />786343.423;(941)483- <br />RauLFabrg§jrpl.�lyb.G.m,.jgtLon <br />97605W 394Un St Florida City <br />$ 2,150,94200 <br />won entail <br />alargee environmentally alH <br />systeivelannalargehntheretention <br />Completed <br />100% <br />Jam19 <br />& Retention Pit Proje. <br />Beach, FL 33408 <br />(Cemaet Sepciallst) <br />2069 <br />— <br />FPL Turpond key Plant <br />sensttNe land area within the FPLTurkey PIaM facility. <br />700 Universe Blvd, Juno <br />David Fite; Luk Garcia <br />305.377.4146;(941) <br />David.Fitalprt,aiJB7V6,SVrcIg".cp <br />1424 NW Miami PI <br />$ 652AOD.00 <br />Completed <br />100% <br />Jun•10 <br />FPLSquare Sq—Station DudBank <br />FPL <br />Beach, FL 33408 <br />(Comma Sepcialkt) <br />483-2069 <br />M-FPL-RiverLanding <br />FPL <br />700 Unlvarsa BNtl,Juno <br />David Ffte; Luk Garcia <br />305.377,4346(941) <br />David F-"mJuh.G.rcJ l.00 <br />1400 NW North River Dr, Miami <br />$ 444,400.00 <br />Completed <br />100% <br />O#-19 <br />Beach, FL 33408 <br />(ContractSepalalist) <br />483.2069 <br />700 Universe BNd,Juno <br />David Fbe; Luk Garcia <br />305.377,4146;1941) <br />David.FhelWrl.com•Iuk.G—LIV.pLou <br />Miami Dade <br />$ 3,000,000.00 <br />Active <br />100% <br />on hold due on devel,per <br />FPL -Dud Bank Work Mum POS <br />FPL <br />Beach, FL 33408 <br />(Comma Sepcialbt) <br />483.2069 <br />no <br />700 Universe Blvd, Juno <br />David Fite; Luis Garcia <br />305.377.4146;(941) <br />Davd.F1m*folcom'lub Garcia@foLro <br />97605W 344th St. Florida City <br />$ 2,150,942.00 <br />Completed <br />100% <br />Feb -19 <br />D&Z FPL 40CRF112 Containment Str <br />FPL <br />Beach, FL 33408 <br />(ComaGSepaalist) <br />483-2069 <br />Open, Based on <br />700 Universe Blvd, luno <br />David Fine; Luk Garcia <br />305.377.4146;(941) <br />D.Id.F6@¢fd,..O;Ipjf,1;arcl._@_q.I.- <br />Miami Dade <br />Comma Rate of <br />Completed <br />100% <br />Sep -IS <br />FPL Emergency/URD Dud Bank <br />FPL <br />Beach, FL 33408 <br />(ComrectSepctalkt) <br />483.2069 <br />Il9 Mit <br />FPL <br />700 Universe Blvd, luno <br />David File; Luis Garcia <br />3D5.377.4146;(941) <br />David.FiteP9nl.rom-luis.Wrtlal/B I.ro <br />6901 Collins Ave, Miami Beach <br />$ 491,430.00 <br />Completed <br />100% <br />Feb -]9 <br />L'eellerHntel <br />Beach, FL 33408 <br />(ContactSepcialist) <br />483-2069 <br />on <br />Installation of duds & hangars system on the 15 mile bridge being <br />buil an Tamlaml Troll approximately 12 miles we# of Kmme Ave <br />(bridge 1. The rad wmadoreapaid to have the bridge bulk and <br />70D Universe Blvd, Juno <br />David Fka; Luk Garda <br />305.377.4146;(941) <br />David.Frt �IPI.m�lyb.Wrdalrpi.ce <br />A. <br />$ 156,20000 <br />ready for FPLW lnerwilthe duds& handers system and splice b"es <br />Completed <br />100% <br />Mar -19 <br />FPL-Dud&Hander West Bridge UG <br />FPL <br />Beach, FL 33408 <br />(CommaSepclalkt) <br />483-2059 <br />— <br />SW Bth St., Miami <br />bymld-July. He b lrutalling the concrete insert loops and plastic <br />caps for us. The job design has been completed but there are no <br />MECO units forthb work. The material will be acquired from <br />Cendux thrum PO/Shopping Cart process <br />700 Universe Blvd, luno <br />Hug, Cama; Luk Garcia <br />305-299J264;(941) <br />NW 195th Street &HIM 12th Ave Miami Gdns <br />$ g,B'9MOD <br />DIRECO00' ONAL BORE 45OF 16' FLU CONDUIT AND PULL IOOD <br />Completed <br />100% <br />Aug -29 <br />FPLCoumy Line Boa - Miami Gardens <br />FPL <br />Beach, FL 33408 <br />(Contad5epclali#) <br />483-2069 <br />Iuk.Garcia@fd.mm <br />MCM FROM RISER TO RISER <br />700 Universe Blvd, Juno <br />David Fee; Luis Garcia <br />305377.4146; 1941) <br />lVk.Garc1a 11d.en <br />74105E 14 St., Miami FL <br />$ 145,400.00 <br />Completed <br />10096 <br />Jul -19 <br />FPL -Commodore BayMlemi <br />FPL <br />Beach, FL 33403 <br />(ContactSepcialos) <br />483-2069 <br />Yard <br />FPL <br />700 Universe Blvd, Juno <br />David Fite; Luis Garcia <br />305.377.4346;(941) <br />DavidFita@folmm:luis.Wdia@folk <br />122 SW 3rd St. Miami Fl <br />$ 564,616.00 <br />Completed <br />10D% <br />J-19 <br />FPL{ental <br />Bead,, FL 33408 <br />(ContactSepclallit) <br />483-2069 <br />Timberlake 70-5237 (62H)— WR 7366478 (Loos 1.28 & 32.1-33.61 <br />FOR Bow., 2154 CMH §3,550' FOR bore -12' min distance to other <br />utilities o 2,220'; 26" HDPE eondum (D spare) — IOOOA KCMIL cable <br />§ 36" min cover llCrossing SW 73rd Ave (5/O 5200 SW 73rd Ave) <br />]OD Universe Blvd, Juno <br />Ymmar Smith; Luis Garda <br />954-494.8625;(941) <br />26 NW 80th Ave., Sunrise FL <br />$ 317,,400.00 <br />1,330,4-6"HDPE ronduit(2 sores]-100DA KCMIL cable§ <br />Completed <br />100% <br />J-19 <br />FPL-Timbedaka Boa <br />FPL <br />Beach, FL 33408 <br />(Comma Sepcialist) <br />483.2069 <br />Iuk.Garota@(ol.rom <br />Crossing:•SW 76th Ave(N/053555W 76th Ave); 36'min cover <br />GIN 70th Ave (SIC 51505W 70TH AVE); 36' min averlll-930'PRI <br />bore-IY min distance 1. the, utllmlas is 36- in cover, l6' <br />HDPE conduct-1/GA cable 02 feeder riser Installations; 22 feeder <br />splice bo. Indella l-410,700' of G' HDPE conduit <br />David.Fka@bl.com:lub.Gartia@fol.ro <br />Installatlonofa six 6'duabank betweentwo mWnmanh,lm <br />Miami World Censer <br />FPL <br />700 Universe Blvd, Juno <br />David Fmuk e; LGarda <br />Luis <br />305.377,4146;(943) <br />NE IST AVE. MIMI <br />$ 202,]15.00 <br />from N Miami Aveto NE 1#0.VE alongthe 7th 5t Promenade.The <br />Active <br />75% <br />TBD <br />— <br />Beach, FL 33400 <br />(Cemnd <br />4183-2069 <br />dud bank require a 330 section of directional bore. <br />The purpose ofthbjob Is to install a dud bank and man hole <br />Oavid.Fee@fd.rom:luk.Gadia@firLce <br />system along Sevilla Ave between Ponce de Leon and Galiano St <br />Seville Ave Dud Bank <br />FPL <br />700 Universe BNd, Juno <br />David Fite; Luk Garcia <br />LuisSmaGardlist) <br />305.3]],4146; (941) <br />2305evllla Ave <br />$ 271,670.00 <br />Thejob requires the Installation bytrendi of roughly 290, of 126" <br />Com.Pleted <br />100% <br />Nov -19 <br />Banierse 33408 <br />(Contact <br />48}2069 <br />Dud bank and 165' of 66" Dud bank. A new 2 way man hole w0I <br />also need to be installed. <br />Gables Dud Bank <br />FPL <br />700 Universe Blvd, Juno <br />David Flt.; Luk Garcia <br />305.377A146;(941) <br />Drvtd.Ftte@foLrom:luis.Garcia@fd.ro <br />2515 Dixie Hwy <br />$ 250,400.00 <br />Completed <br />1013% <br />D-19 <br />Beach, FL 33408 <br />(ContactSapcialist) <br />483-2069 <br />Sweetwater <br />FPL <br />700 Universe Blvd, Juno <br />David Fee; Luk Garcia <br />305.377A146(941) <br />David.Fme@fol.com:luk.Gamla@fol.ca <br />NW Gth St. &NW 136th PL <br />$ 258,400,40 <br />Active <br />0% <br />Job Cancelled for new design <br />M <br />Reach, FL 33408 <br />(Coma. Sepdalbt) <br />483-2069 <br />700 Universe Blvd, luno <br />David Fee; Lub Garcia <br />305.377.4146;(941) <br />David.Frefllol.cem-luk.Gxrdafrston <br />10750 NW 21 St, D—I FL <br />$ 125,400.00 <br />Completed <br />100% <br />--0Beach, <br />FPL -Bacon UGTrench Pull able <br />FPL <br />FL 33408 <br />(Comrad5epcialist) <br />4832069 <br />FPL- Golden Glades Bore <br />FPL <br />700 U.N.—Blvd, Juno <br />Andres Moscoso <br />305.552.2042 <br />NW 183 St W. Sumhla State PKWY <br />$ 132,005.00 <br />Completed <br />10096 <br />Nov -21 <br />Beach, FL 33408 <br />INTEGRATEDSUPPLY <br />Richard Dlaz (FPL <br />War <br />CHAIN CONTACT <br />WRp8096238/ Extend Dud Bank along Galiano Street Thesrope <br />700 Universe Blvd, Juno <br />INSPECTOR <br />INFORMATION: <br />of this project Isto install approx. 11,000 FT of 61mh conduit and <br />90% <br />TBD <br />Galiano Street Dud Bank <br />FPL <br />Beach, FL 33408 <br />INFORMATION:)OFFICE <br />NAME: Rosie Castro <br />., .ssseftoi ..un <br />PONCE DE LEON BLVD, CORALGABLES <br />535,370.00 <br />nccased dun hank along with <br />1,500 FT of5lrnch In maaen <br />Active <br />PH: 305.726.1000MOBILE <br />OFFICE PHONE: 561 -SW <br />manholes, <br />PH: 305.726-1000 <br />5284 <br />Tollway <br />FPL <br />700 Universe Blvd, Juror <br />Beach,FL 33408 <br />CARTRO RAMBARRAN <br />ROCIO <br />305.377.4146;(941) <br />4832069 <br />RTCOPSY@FPLCOM <br />NW117AVE&NW415T <br />232'ecill <br />equipment, tools, nsportation, and supplies repo <br />Completed <br />100% <br />February 1, 2023 <br />URD MIamI <br />FPL <br />70OUnNerse Blvd, Juno <br />David Fit.; Luis Garcia <br />305.377.4146(941) <br />David.FRe@fol.rom:I,b,Gardi@fpl.ro <br />Mufti WR's <br />3,000,000.00 <br />URD underground <br />rgroun <br />Active <br />309E <br />Yearly Comae <br />Beach, FL 33408 <br />(ounumd5aclalet) <br />4832069 <br />70D Universe Blvd, Juno <br />Insullapprox.50Oof9-6conduhbybombatwm,n ,manh,ks <br />Active <br />0% <br />WP9571]061-395 DB HDPE <br />FPL <br />Beach FL 33408 <br />Co— Rambamen Rod, <br />561-304-5284 <br />RTCOPSY@FPLCOM <br />NE 13TH St <br />$396/R10DO <br />and Full mom.. 120W f.bl.. <br />4200 Parliament PL Suite <br />Coconut Grove from SW 37th Ave and SW 40th <br />$3,198,400.00 <br />Civil Scope including excavation& manhole histallation, Earth <br />Active <br />15% <br />WA Chester ComnutGrove <br />FPL <br />400 <br />Lim Michael <br />202359.6875 <br />Imirbael@wathester.mm <br />Street to SW 15th Avenue <br />WorkImmillation of Electrical -Iia, and restaation of project site <br />, <br />700 UnN... Blvd, luno <br />David Ffte; Luk Garcia <br />305.377.4146;(941) <br />David.Fka@fol.mm:luis.Garda@(Dins <br />VALENCIA <br />$641,320.00 <br />2.291 LF of FM, 2.211 LF of RWM, removal and abandonment of <br />TBD <br />FPLVaImda Ave (WR 0:9303716) <br />FPL <br />Beach, FL 33409 <br />700UnN... SKI— <br />Bead, FL 33409 <br />(ContactSepdall#) <br />483-2069 <br />AVE, CORAL GABLES <br />tabling utilities, Mill/Overiev/PM's <br />FPL LED Dade&Broward <br />FPL <br />0.1. Bm, <br />561.681.3131 <br />rzie.bnto@(bl.mm <br />MuitlPleloatlons <br />3,000,00000 <br />Work orders- Lights and poles installation. <br />Active <br />30% <br />FPL Cental.coward I.... Ce mer <br />FPL <br />700UrIv me Blvd,Juno <br />David Brobst <br />561.694.3271 <br />David.Brobst@fol.mm <br />11205 NW 44th Streit, Sunrise, Fl. <br />$1.021,425.00 <br />Asphah/Concrete Demolition and Re•Pavin&Striping• <br />Active <br />15% <br />Beach FL 33408 <br />