FPL PROJECTS INCLUDING DUCT BANK
<br />Job Name
<br />Owner
<br />Address of Owner
<br />PeoumcfCamost/phone M/Ercall
<br />Add—.fJob
<br />C.—Valu.
<br />Da ... R lon.1Work
<br />Status Complete
<br />Data Component
<br />The Workto be performed underthb Comas Includes, but Is not
<br />Ilmbetlta, the following: (I) Installation of nine (9) Biscayne Aqu-der
<br />recovery wells (RW I atthe Sfte. (2) A minimum oftwo recovery
<br />FPL•PTNCRPTurkey Palm Biscayne Aquifer Recovery Well
<br />700 Universe Blvd, Jun,
<br />Mr.,; Lula Gamla(Comma
<br />(561)904-3641;(941)
<br />Raul Febre@fol lue.Gamia@fits,
<br />0760 SW 344th St Florida City; Turkey Peim
<br />$ 1],433,140.00
<br />walls shall be installed at one time, requiring the use of multiple drill
<br />Completed
<br />100%
<br />Sep -15
<br />—
<br />System
<br />FPL
<br />Beach, FL 33408
<br />Sepclall#)
<br />483.2069
<br />N..I—Pians
<br />rigs. (3) Preparation of a geologic log. 14) Bore hole geophysical
<br />logging. (5) Development and testing of each recovery wall. (6)
<br />Survey of each redwery well site to include tap of casing and well
<br />pad elevation. (7) Sha closeout activities.
<br />Project rons of edegnofa Ca#in[,ace ll ator
<br />FPL -Turkey Point Bay 11 Turkey Point Oil y Water Separator
<br />FPL
<br />700 Universe Blvd, Juno
<br />Raul Feba; Luk Garcia
<br />786343.423;(941)483-
<br />RauLFabrg§jrpl.�lyb.G.m,.jgtLon
<br />97605W 394Un St Florida City
<br />$ 2,150,94200
<br />won entail
<br />alargee environmentally alH
<br />systeivelannalargehntheretention
<br />Completed
<br />100%
<br />Jam19
<br />& Retention Pit Proje.
<br />Beach, FL 33408
<br />(Cemaet Sepciallst)
<br />2069
<br />—
<br />FPL Turpond key Plant
<br />sensttNe land area within the FPLTurkey PIaM facility.
<br />700 Universe Blvd, Juno
<br />David Fite; Luk Garcia
<br />305.377.4146;(941)
<br />David.Fitalprt,aiJB7V6,SVrcIg".cp
<br />1424 NW Miami PI
<br />$ 652AOD.00
<br />Completed
<br />100%
<br />Jun•10
<br />FPLSquare Sq—Station DudBank
<br />FPL
<br />Beach, FL 33408
<br />(Comma Sepcialkt)
<br />483-2069
<br />M-FPL-RiverLanding
<br />FPL
<br />700 Unlvarsa BNtl,Juno
<br />David Ffte; Luk Garcia
<br />305.377,4346(941)
<br />David F-"mJuh.G.rcJ l.00
<br />1400 NW North River Dr, Miami
<br />$ 444,400.00
<br />Completed
<br />100%
<br />O#-19
<br />Beach, FL 33408
<br />(ContractSepalalist)
<br />483.2069
<br />700 Universe BNd,Juno
<br />David Fbe; Luk Garcia
<br />305.377,4146;1941)
<br />David.FhelWrl.com•Iuk.G—LIV.pLou
<br />Miami Dade
<br />$ 3,000,000.00
<br />Active
<br />100%
<br />on hold due on devel,per
<br />FPL -Dud Bank Work Mum POS
<br />FPL
<br />Beach, FL 33408
<br />(Comma Sepcialbt)
<br />483.2069
<br />no
<br />700 Universe Blvd, Juno
<br />David Fite; Luis Garcia
<br />305.377.4146;(941)
<br />Davd.F1m*folcom'lub Garcia@foLro
<br />97605W 344th St. Florida City
<br />$ 2,150,942.00
<br />Completed
<br />100%
<br />Feb -19
<br />D&Z FPL 40CRF112 Containment Str
<br />FPL
<br />Beach, FL 33408
<br />(ComaGSepaalist)
<br />483-2069
<br />Open, Based on
<br />700 Universe Blvd, luno
<br />David Fine; Luk Garcia
<br />305.377.4146;(941)
<br />D.Id.F6@¢fd,..O;Ipjf,1;arcl._@_q.I.-
<br />Miami Dade
<br />Comma Rate of
<br />Completed
<br />100%
<br />Sep -IS
<br />FPL Emergency/URD Dud Bank
<br />FPL
<br />Beach, FL 33408
<br />(ComrectSepctalkt)
<br />483.2069
<br />Il9 Mit
<br />FPL
<br />700 Universe Blvd, luno
<br />David File; Luis Garcia
<br />3D5.377.4146;(941)
<br />David.FiteP9nl.rom-luis.Wrtlal/B I.ro
<br />6901 Collins Ave, Miami Beach
<br />$ 491,430.00
<br />Completed
<br />100%
<br />Feb -]9
<br />L'eellerHntel
<br />Beach, FL 33408
<br />(ContactSepcialist)
<br />483-2069
<br />on
<br />Installation of duds & hangars system on the 15 mile bridge being
<br />buil an Tamlaml Troll approximately 12 miles we# of Kmme Ave
<br />(bridge 1. The rad wmadoreapaid to have the bridge bulk and
<br />70D Universe Blvd, Juno
<br />David Fka; Luk Garda
<br />305.377.4146;(941)
<br />David.Frt �IPI.m�lyb.Wrdalrpi.ce
<br />A.
<br />$ 156,20000
<br />ready for FPLW lnerwilthe duds& handers system and splice b"es
<br />Completed
<br />100%
<br />Mar -19
<br />FPL-Dud&Hander West Bridge UG
<br />FPL
<br />Beach, FL 33408
<br />(CommaSepclalkt)
<br />483-2059
<br />—
<br />SW Bth St., Miami
<br />bymld-July. He b lrutalling the concrete insert loops and plastic
<br />caps for us. The job design has been completed but there are no
<br />MECO units forthb work. The material will be acquired from
<br />Cendux thrum PO/Shopping Cart process
<br />700 Universe Blvd, luno
<br />Hug, Cama; Luk Garcia
<br />305-299J264;(941)
<br />NW 195th Street &HIM 12th Ave Miami Gdns
<br />$ g,B'9MOD
<br />DIRECO00' ONAL BORE 45OF 16' FLU CONDUIT AND PULL IOOD
<br />Completed
<br />100%
<br />Aug -29
<br />FPLCoumy Line Boa - Miami Gardens
<br />FPL
<br />Beach, FL 33408
<br />(Contad5epclali#)
<br />483-2069
<br />Iuk.Garcia@fd.mm
<br />MCM FROM RISER TO RISER
<br />700 Universe Blvd, Juno
<br />David Fee; Luis Garcia
<br />305377.4146; 1941)
<br />lVk.Garc1a 11d.en
<br />74105E 14 St., Miami FL
<br />$ 145,400.00
<br />Completed
<br />10096
<br />Jul -19
<br />FPL -Commodore BayMlemi
<br />FPL
<br />Beach, FL 33403
<br />(ContactSepcialos)
<br />483-2069
<br />Yard
<br />FPL
<br />700 Universe Blvd, Juno
<br />David Fite; Luis Garcia
<br />305.377.4346;(941)
<br />DavidFita@folmm:luis.Wdia@folk
<br />122 SW 3rd St. Miami Fl
<br />$ 564,616.00
<br />Completed
<br />10D%
<br />J-19
<br />FPL{ental
<br />Bead,, FL 33408
<br />(ContactSepclallit)
<br />483-2069
<br />Timberlake 70-5237 (62H)— WR 7366478 (Loos 1.28 & 32.1-33.61
<br />FOR Bow., 2154 CMH §3,550' FOR bore -12' min distance to other
<br />utilities o 2,220'; 26" HDPE eondum (D spare) — IOOOA KCMIL cable
<br />§ 36" min cover llCrossing SW 73rd Ave (5/O 5200 SW 73rd Ave)
<br />]OD Universe Blvd, Juno
<br />Ymmar Smith; Luis Garda
<br />954-494.8625;(941)
<br />26 NW 80th Ave., Sunrise FL
<br />$ 317,,400.00
<br />1,330,4-6"HDPE ronduit(2 sores]-100DA KCMIL cable§
<br />Completed
<br />100%
<br />J-19
<br />FPL-Timbedaka Boa
<br />FPL
<br />Beach, FL 33408
<br />(Comma Sepcialist)
<br />483.2069
<br />Iuk.Garota@(ol.rom
<br />Crossing:•SW 76th Ave(N/053555W 76th Ave); 36'min cover
<br />GIN 70th Ave (SIC 51505W 70TH AVE); 36' min averlll-930'PRI
<br />bore-IY min distance 1. the, utllmlas is 36- in cover, l6'
<br />HDPE conduct-1/GA cable 02 feeder riser Installations; 22 feeder
<br />splice bo. Indella l-410,700' of G' HDPE conduit
<br />David.Fka@bl.com:lub.Gartia@fol.ro
<br />Installatlonofa six 6'duabank betweentwo mWnmanh,lm
<br />Miami World Censer
<br />FPL
<br />700 Universe Blvd, Juno
<br />David Fmuk e; LGarda
<br />Luis
<br />305.377,4146;(943)
<br />NE IST AVE. MIMI
<br />$ 202,]15.00
<br />from N Miami Aveto NE 1#0.VE alongthe 7th 5t Promenade.The
<br />Active
<br />75%
<br />TBD
<br />—
<br />Beach, FL 33400
<br />(Cemnd
<br />4183-2069
<br />dud bank require a 330 section of directional bore.
<br />The purpose ofthbjob Is to install a dud bank and man hole
<br />Oavid.Fee@fd.rom:luk.Gadia@firLce
<br />system along Sevilla Ave between Ponce de Leon and Galiano St
<br />Seville Ave Dud Bank
<br />FPL
<br />700 Universe BNd, Juno
<br />David Fite; Luk Garcia
<br />LuisSmaGardlist)
<br />305.3]],4146; (941)
<br />2305evllla Ave
<br />$ 271,670.00
<br />Thejob requires the Installation bytrendi of roughly 290, of 126"
<br />Com.Pleted
<br />100%
<br />Nov -19
<br />Banierse 33408
<br />(Contact
<br />48}2069
<br />Dud bank and 165' of 66" Dud bank. A new 2 way man hole w0I
<br />also need to be installed.
<br />Gables Dud Bank
<br />FPL
<br />700 Universe Blvd, Juno
<br />David Flt.; Luk Garcia
<br />305.377A146;(941)
<br />Drvtd.Ftte@foLrom:luis.Garcia@fd.ro
<br />2515 Dixie Hwy
<br />$ 250,400.00
<br />Completed
<br />1013%
<br />D-19
<br />Beach, FL 33408
<br />(ContactSapcialist)
<br />483-2069
<br />Sweetwater
<br />FPL
<br />700 Universe Blvd, Juno
<br />David Fee; Luk Garcia
<br />305.377A146(941)
<br />David.Fme@fol.com:luk.Gamla@fol.ca
<br />NW Gth St. &NW 136th PL
<br />$ 258,400,40
<br />Active
<br />0%
<br />Job Cancelled for new design
<br />M
<br />Reach, FL 33408
<br />(Coma. Sepdalbt)
<br />483-2069
<br />700 Universe Blvd, luno
<br />David Fee; Lub Garcia
<br />305.377.4146;(941)
<br />David.Frefllol.cem-luk.Gxrdafrston
<br />10750 NW 21 St, D—I FL
<br />$ 125,400.00
<br />Completed
<br />100%
<br />--0Beach,
<br />FPL -Bacon UGTrench Pull able
<br />FPL
<br />FL 33408
<br />(Comrad5epcialist)
<br />4832069
<br />FPL- Golden Glades Bore
<br />FPL
<br />700 U.N.—Blvd, Juno
<br />Andres Moscoso
<br />305.552.2042
<br />NW 183 St W. Sumhla State PKWY
<br />$ 132,005.00
<br />Completed
<br />10096
<br />Nov -21
<br />Beach, FL 33408
<br />INTEGRATEDSUPPLY
<br />Richard Dlaz (FPL
<br />War
<br />CHAIN CONTACT
<br />WRp8096238/ Extend Dud Bank along Galiano Street Thesrope
<br />700 Universe Blvd, Juno
<br />INSPECTOR
<br />INFORMATION:
<br />of this project Isto install approx. 11,000 FT of 61mh conduit and
<br />90%
<br />TBD
<br />Galiano Street Dud Bank
<br />FPL
<br />Beach, FL 33408
<br />INFORMATION:)OFFICE
<br />NAME: Rosie Castro
<br />., .ssseftoi ..un
<br />PONCE DE LEON BLVD, CORALGABLES
<br />535,370.00
<br />nccased dun hank along with
<br />1,500 FT of5lrnch In maaen
<br />Active
<br />PH: 305.726.1000MOBILE
<br />OFFICE PHONE: 561 -SW
<br />manholes,
<br />PH: 305.726-1000
<br />5284
<br />Tollway
<br />FPL
<br />700 Universe Blvd, Juror
<br />Beach,FL 33408
<br />CARTRO RAMBARRAN
<br />ROCIO
<br />305.377.4146;(941)
<br />4832069
<br />RTCOPSY@FPLCOM
<br />NW117AVE&NW415T
<br />232'ecill
<br />equipment, tools, nsportation, and supplies repo
<br />Completed
<br />100%
<br />February 1, 2023
<br />URD MIamI
<br />FPL
<br />70OUnNerse Blvd, Juno
<br />David Fit.; Luis Garcia
<br />305.377.4146(941)
<br />David.FRe@fol.rom:I,b,Gardi@fpl.ro
<br />Mufti WR's
<br />3,000,000.00
<br />URD underground
<br />rgroun
<br />Active
<br />309E
<br />Yearly Comae
<br />Beach, FL 33408
<br />(ounumd5aclalet)
<br />4832069
<br />70D Universe Blvd, Juno
<br />Insullapprox.50Oof9-6conduhbybombatwm,n ,manh,ks
<br />Active
<br />0%
<br />WP9571]061-395 DB HDPE
<br />FPL
<br />Beach FL 33408
<br />Co— Rambamen Rod,
<br />561-304-5284
<br />RTCOPSY@FPLCOM
<br />NE 13TH St
<br />$396/R10DO
<br />and Full mom.. 120W f.bl..
<br />4200 Parliament PL Suite
<br />Coconut Grove from SW 37th Ave and SW 40th
<br />$3,198,400.00
<br />Civil Scope including excavation& manhole histallation, Earth
<br />Active
<br />15%
<br />WA Chester ComnutGrove
<br />FPL
<br />400
<br />Lim Michael
<br />202359.6875
<br />Imirbael@wathester.mm
<br />Street to SW 15th Avenue
<br />WorkImmillation of Electrical -Iia, and restaation of project site
<br />,
<br />700 UnN... Blvd, luno
<br />David Ffte; Luk Garcia
<br />305.377.4146;(941)
<br />David.Fka@fol.mm:luis.Garda@(Dins
<br />VALENCIA
<br />$641,320.00
<br />2.291 LF of FM, 2.211 LF of RWM, removal and abandonment of
<br />TBD
<br />FPLVaImda Ave (WR 0:9303716)
<br />FPL
<br />Beach, FL 33409
<br />700UnN... SKI—
<br />Bead, FL 33409
<br />(ContactSepdall#)
<br />483-2069
<br />AVE, CORAL GABLES
<br />tabling utilities, Mill/Overiev/PM's
<br />FPL LED Dade&Broward
<br />FPL
<br />0.1. Bm,
<br />561.681.3131
<br />rzie.bnto@(bl.mm
<br />MuitlPleloatlons
<br />3,000,00000
<br />Work orders- Lights and poles installation.
<br />Active
<br />30%
<br />FPL Cental.coward I.... Ce mer
<br />FPL
<br />700UrIv me Blvd,Juno
<br />David Brobst
<br />561.694.3271
<br />David.Brobst@fol.mm
<br />11205 NW 44th Streit, Sunrise, Fl.
<br />$1.021,425.00
<br />Asphah/Concrete Demolition and Re•Pavin&Striping•
<br />Active
<br />15%
<br />Beach FL 33408
<br />
|