Active Projects
<br />Project Manager
<br />Superintendent
<br />Foreman
<br />Job #
<br />lob Name
<br />Owner
<br />Addressof Owner
<br />Person of Contact/Phone If /Email
<br />Contractor
<br />Address of Job
<br />Contract Value
<br />Description of Work
<br />Status Complete
<br />Estimated
<br />Completion Date
<br />Date Completed
<br />Over 3 miles of roadway reconstruction, full 4lane divided with
<br />continuous drainage, street lighting, traffic signalization, a culvert
<br />1000 N.W. 111 Avenue
<br />John M Garzia; Mario
<br />786.510.6822;
<br />John.Garzia@dot.state.0'us;
<br />Ferreira Construction
<br />NW 47 Ave From NW 183 S[ to NW 19957
<br />$ 18,966,444.00
<br />extension, bridge widening and the construction of approximatelyAna
<br />Active
<br />95%
<br />ADr-21
<br />TBD
<br />de Priest
<br />lose De Jesus
<br />Jorge Prado
<br />4190
<br />FOOT 76427- NW 47 Ave From NW 183 St to NW 199 ST
<br />FDOT-76427
<br />Miami, Florida 33172
<br />Cabrera
<br />305.216.4962
<br />Marlo.Cabrera@dot.stateftus
<br />2 miles of 16" water main with cross connections and
<br />abandonment of the old main as a joint project with Miami -Dade
<br />Water & Sewer.
<br />Installation of a six 6" duct bank between two existing manholes
<br />Lourie Steele
<br />Bill Richards
<br />Erwin
<br />4234
<br />Miami World Center
<br />FPL
<br />700 Universe Blvd, Ju no
<br />David Fite; Gary A Carstens
<br />305.377.4146;(941)
<br />David.Fte�rpLcom•
<br />Ferreira Construction
<br />NE 15T AVE, MIAMI
<br />$ 202,715.00
<br />from N Miami Ave to NE 1st AVE along the 7th St Promenade. The
<br />Active
<br />75%
<br />TBD
<br />Beach, FL 33408
<br />(Contract Sepcialist)
<br />483-2069
<br />Garv.A.Cars mV_1pl.com
<br />duct bank require a 330' section of directional bore.
<br />Course Steele
<br />Bill Richards
<br />Erwin
<br />4250
<br />Sweetwater
<br />FPL
<br />700 Universe Blvd, Juno
<br />David Fite; Gary A Carstens
<br />305.377.4146; (941)
<br />David.Fite@fol.com:
<br />Ferreira Construction
<br />NW 6th St & NW 136th PL
<br />$ 258,400.00
<br />Active
<br />096
<br />Job Cancelled for new design
<br />Beach, FL 33408
<br />(Contract Sepcialist)
<br />483-2069
<br />Garv.A.Carstens®Inl.com
<br />Jasmine Gutierrez
<br />Salvador Gomez
<br />TBD
<br />4271
<br />P&K South District WWTP 20601
<br />Miami Dade
<br />Asif Shalkh
<br />305.329.1930
<br />Poole & Kent
<br />8950 sw 232nd st
<br />$ 1,028,180.00
<br />Active
<br />20%
<br />Dec -22
<br />TED
<br />Jasmine Gutierrez
<br />Mike Evain
<br />TBD
<br />4272
<br />P&K South District W WTP 20602
<br />Miami Dade
<br />AsifShalkh
<br />305.329.1930
<br />Poole & Kent
<br />3989 Rickenbacker Causeway
<br />$ 2,061,511.DD
<br />Active
<br />20%
<br />Dec -22
<br />TBD
<br />Richard Diaz (FPL
<br />INTEGRATED SUPPLY
<br />700 Universe Blvd, Juno
<br />INSPECTOR CONTACT
<br />CHAIN CONTACT
<br />INFORMATION:
<br />WR# 8096238 / Extend Duct Bank along Galiano Street; The scope
<br />of this project is to Install approx. 11,000 FT of 6 Inch conduit and
<br />Active
<br />90%
<br />TBD
<br />Courie Steele
<br />Erwin Merchant
<br />TBD
<br />4282
<br />Galiano Street Duct Bank
<br />FPL
<br />Beach, FL 33408
<br />INFORMATION: )OFFICE
<br />NAME: Rosie Castro
<br />=' A Carste-L fcl.com
<br />Ferreira Construction
<br />PONCE DE LEON BLVD, CORAL GABLES
<br />535,370.00
<br />1,500 FT of 5 Inch in concreate encased duct bank along with 3
<br />PH: 305.726.1000MOBILE
<br />OFFICE PHONE: 561-3(M
<br />manholes,
<br />PH: 305-726-1000
<br />5284
<br />Lourie Steele
<br />Erwin Merchant
<br />4299
<br />URD Miami
<br />FPL
<br />700 Universe Blvd, Juno
<br />David Fite; Gary A Carstens
<br />305.377.4146; (941)
<br />David.Fhagfol.com:
<br />Ferreira Construction
<br />Multiple WR's
<br />TBD
<br />URD underground
<br />Active
<br />30%
<br />3/1/2023
<br />Yearly Contract
<br />Beach, FL 33408
<br />(Contract Sepcialist)
<br />483-2069
<br />Garv.A.Carstens*lol.com
<br />Course Steele
<br />Erwin Merchant
<br />4300
<br />WR9571706 4395 DB HDPE
<br />FPL
<br />700 Un1erse Blvd, luno
<br />Castro Rambaman Rodo
<br />561-304-5284
<br />RTCOPSyBFPL.COM
<br />Ferreira Construction
<br />NE 13TH St
<br />$396,400.00
<br />Install approx. 500' of 9-6 conduit by bore between two manholes
<br />Active
<br />0%
<br />Beach FL33408
<br />and null as rox.1200' f=en
<br />nourishment consisting of approximately 23,000 cubic yards (C1')
<br />of sand and dune planting within the authorized template
<br />between Florida Department of Environmental Protection (FDEP)
<br />reference monuments R-101 and R-108, with the bid alternate of
<br />an addltiona18,0o0 CY of sand placement.
<br />The Vendor shall provide all necessary labor, materials, and
<br />Sonesta Drive and Ocean Drive, Key Biscayne, FL
<br />equipment to provide the Services.
<br />88 W McIntyre St Suiteb 250
<br />33149
<br />The Services shall include, but not be specifically limited to, the
<br />Hector Blanco
<br />Salvador Gomez
<br />TBD
<br />4307
<br />Village of Key Biscayne -No. 2021-05 2021 Beach
<br />Village of Key
<br />Key Biscayne, FL 33149
<br />Roland Samimy
<br />305.365.8908
<br />rsa�&keyblscarr�e�
<br />Ferreira Construction
<br />located on an island approximately six (6) miles
<br />$3,663,364.00
<br />following:
<br />Active
<br />90%
<br />6/30/2021
<br />Renourishment Project
<br />Biscayne
<br />into Biscayne Bay and connected to the
<br />•Mobilization
<br />mainland via the Rickenbacker Causeway
<br />• Deliver, Place, and Survey Beach Compatible Sand
<br />• Turbidity Monitoring
<br />• vibration Control and Monitoring
<br />• Beach Tilling
<br />• Geotechnical Testing
<br />• Temporary Construction Staging and Access Areas
<br />• Dune Planting
<br />Jasmine Gutierrez
<br />Yomir Hechavarria
<br />TBD
<br />4314
<br />W.A. Chester Coconut Grove
<br />FPL
<br />4200 Parliament PL Suite
<br />lien Michael
<br />202.359.6875
<br />Imichael�wachester.com
<br />WA Chester
<br />Coconut Grove from SW 37th Ave and SW 40th
<br />$3,198,400.00
<br />Civil Scope including excavation & manhole installation, Earth
<br />Active
<br />15%
<br />May -22
<br />400
<br />Street to SW 15th Avenue
<br />Work, Installation of Electrical volts, and restoration of project site
<br />Hector Blanco
<br />Salvador Gomez
<br />TBD
<br />4322
<br />Duck Key Utility Relocation
<br />FKAA
<br />3200 Overseas Hwy,
<br />Marathon FL 33050
<br />Justin Dacey
<br />3052952151
<br />klicevpfkaa.com>
<br />Ferreira Construction
<br />Harbour Drive & Seaview Drive
<br />$1,207,400.00
<br />Utility Relocations: 1,104 LF of PWM,
<br />Active
<br />20%
<br />700 Universe Blvd, Juno
<br />David Fite; Gary A Carstens
<br />305.377.4146; (941)
<br />David.FiteFfRLcom
<br />GABLES
<br />$641,320.00
<br />1,291 LF of FM, 1,211 LF of RWM, removal and abandonment of
<br />TBD
<br />Steele
<br />Coudeeach,
<br />EDvin Merchant
<br />TED
<br />4320
<br />FPL Valencia AveAve(WR#:9303716)
<br />FPL
<br />FL 33408
<br />(Contract Sepdalist)
<br />483-2069
<br />Garv.A.Cars[ensTdfol.com
<br />Ferreira Construction
<br />VALENCIA AVE, CORAL
<br />existing utilities, Mill/Overlay/PM's
<br />Ana De Priest
<br />lase Delesus
<br />TBD
<br />4321
<br />FDOT 76528 -Drainage SR 826 (FRONTAGE RD)
<br />FOOT
<br />1000 N.W. 111 Avenue
<br />Dru Badri
<br />305.401.1560
<br />0r^u.eadriLedot.state.us
<br />Ferreira Construction
<br />ction
<br />626 (FRDNTAGE RD) FROM NW 122 ST TO
<br />$1,659,596.90
<br />Drainage
<br />Active
<br />30%
<br />0%
<br />Miami Florida 33172
<br />NW 138 5T
<br />Utility Relocations: 1,104 LF of PWM,
<br />Hector Blanco
<br />Salvador Gomez
<br />TBD
<br />4322
<br />FL KEYS AQUEDUCT AUTHORITY FKAA Project # 2357.20
<br />FKAA
<br />1100 Kennedy Drive Key
<br />Justin Dacey
<br />305.295.2151
<br />Idacev0fYaa.com
<br />Ferreira Construction
<br />Harbour Drive & Seaview Drive
<br />$1,207,400.00
<br />1,291 LF of FM, 1,211 LF of RWM, removal and abandonment of
<br />Active
<br />30%
<br />7/20/2021
<br />West FL 33040
<br />exirtin- utilities Mil Overla
<br />Improvements
<br />City of Coral
<br />9500 West Sample Road
<br />Miguel Machuca
<br />954.344.1101
<br />n coralsarins.ors
<br />Ferreira Construction
<br />N.W. 35 ST-N.W.39 ST & N.W. 126 Ave-N.W. 118
<br />$3,380.400.50
<br />Drainage,Asphalt removal & milling, concrete removal.
<br />Active
<br />10%
<br />6/26/2022
<br />Ana De Priest
<br />Jose Oejesus
<br />TBD
<br />4326
<br />Corporate Park Stormwater
<br />Springs
<br />Coral S rin s FL 33065
<br />machuwe
<br />AVE
<br />Luis Cordova
<br />Erwin Merchant
<br />TBD
<br />4332
<br />FPL LED Dade & Braward
<br />FPL
<br />700 Universe Blvd, Juno
<br />Beach FL 33408
<br />Ozzie Brito
<br />561.661.3131
<br />ozzie.brhol_hd.com
<br />Ferreira Constrction
<br />Multiple locations
<br />Unknown
<br />Work orders- Lights and poles installation.
<br />Active
<br />10%
<br />6/30/2024
<br />Hector Blanco
<br />Yomir Hechavarria
<br />TBD
<br />4334
<br />FPL Central Broward Service Center
<br />FPL
<br />700 Universe Blvd, Juno
<br />Beach, FL 33408 -
<br />David Brobst
<br />561.694.3271
<br />David .BrobstFlnl.c r,
<br />Ferreira Construction
<br />11205 NW 44th Street, Sunrise, FI.
<br />$1,021,425.00
<br />Asphalt/Concrete Demolition and Re -Paving, Striping.
<br />Active
<br />15%
<br />8/2/2021
<br />Hector Blanes
<br />Salvador Gomez
<br />TBD
<br />4336
<br />USI Miami Substation Civil Work
<br />Underground
<br />3A Trowbridge Drive Bethel,
<br />Edward Woida
<br />203.792.3444
<br />edward.woida2me.com
<br />FPL
<br />Miami Substation
<br />$228,143.00
<br />Excavation of pits and trenches for installation of 2• PVC candu#.
<br />Active
<br />5%
<br />8/8/2021
<br />Systems Inc
<br />CT 06801
<br />Backfilling trenches. Installation of new concrete pad.
<br />Hector Blanco
<br />Yomir Hechavarria
<br />TED
<br />4341
<br />FPL- CRE Golden Gate SC
<br />David Brobst
<br />694.
<br />561.3271
<br />David.Bmbs[�InI.COm
<br />FPL
<br />410515th Ave Naples, FL 34116
<br />$594,000.00
<br />Repaving, removal of asphalt pavement and
<br />ng,
<br />Active
<br />0
<br />Active
<br />Dec -21
<br />base. Rang, e and provide pavement markings
<br />
|