Laserfiche WebLink
EXPERIENCE <br />Job Name <br />Owner <br />Address of Owner <br />Person of Contact / Phone # / Email <br />Address of Job <br />Contract Value <br />Description of Work <br />Status Complete <br />Date Completed <br />Scope of work consisted of 17,824 LF of 16" PVC Water main, <br />T4400 - FDOT-SR7 (U5441) Road Reconstruction <br />FOOT <br />1000 N.W. 111 Avenue <br />Donald Vanwhervin <br />954.931.6187 <br />Hollywood &State Road 7 <br />$ 30,674,813.00 <br />11,250 LF of 16' PVC Water main, Signalization, drainage, Ponds, <br />Completed <br />100% <br />Mar -19 <br />Miami, Florida 33172 <br />medians, sidewalk, curb, paving, signing, sanitary sewerand <br />Lighting. <br />Consists of repair of the canal slopes that have suffered severe <br />erosion along some sections of noise wall 3 located between Pine <br />Peter Nissen; Ken Hudson <br />Island road and University Drive and Noise Wall 6located east of <br />FDOT- E8N90 Phases B & C Sawgrass Canal Revetment <br />FDOT/TPE <br />1000 N.W. Ill Avenue <br />(FDOT/TPE -Project <br />954.934.1113: (954) 934 <br />Peter.Nissen@dot.fl.us <br />Coral Springs <br />$ 8,437,620.84 <br />University drive. 1.6 miles of canal revetment adjacent to sound <br />Completed 100% <br />Aug -17 <br />away SR869 <br />Misami, Florida 33172 <br />Manager) <br />1134 <br />walls along the Sawgrass Expressway. Clearing, grubbing, <br />earthwork and canal bank re -stabilization, sound wall removal and <br />reinstallation. <br />This project was a complete reconstruction of the existing roadway <br />to a four -lane divided roadway. For the experience, Ferreira <br />Broward County Project 5220 - Hiatus Rd from Sunrise <br />Broward County <br />1 N University Dr, <br />Thomas Muzicka <br />954.325.1529 <br />TMUZICKA broward.ort <br />Hiatus Road from Sunrise Blvd. to Oakland Park Blvd. <br />$ 9,134,679.36 <br />Construction self -performed all the clearing & grubbing, drainage, <br />Completed 100% <br />Dec -19 <br />Blvd. to Oakland Park Blvd. <br />plantation, FL 33324 <br />earthwork, flat -work, water main and base rock construction with <br />partnersub-contractorsbuilding the bridge, sound walls, paving <br />and traffic signalization. <br />Clevelnd Const-Walmart Store <br />Walmart <br />301 South State Road 7, Hollywood <br />$ 1,238,213.00 <br />Completed <br />100% <br />Jan -21 <br />FL LEMARK-Merrick Dr. Mods <br />UM <br />Ponce De Leon <br />$ 967,339.00 <br />Completed <br />100% <br />Feb -18 <br />The Improvements underthis Contract consist of milling and <br />resurfacing, drainage improvements, patterned pavement, bike <br />lanes, traffic calming including a traffic circle, signing and <br />FDOTT4446 Old Dixie Highway <br />FOOT <br />1000 N.W. 111 Avenue <br />Maria Izquierdo <br />954-777-4529 <br />D4orcustodian dot.state.fl.us <br />Old Dixie Highway & NE 13 St <br />$ 2,621,390.20 <br />pavement markings, pedestrian lighting, utility adjustments, and <br />Completed <br />100% <br />Jun -18 <br />Miami, Florida 33172 <br />landscaping with special architectural features on Old Dixie <br />Highway from NE 13th Street northerly 0.865 miles to the south <br />end of the bridge over Middle River in the City of Fort Lauderdale, <br />Broward County. <br />PARSONS -BHS lmprvmnts <br />MIA/Dade <br />Miami Terminal <br />$ 2,005,113.00 <br />Completed <br />100% <br />AMA Design -Univision Upgrd <br />AMA Design <br />9405 NW 41st St, Doral <br />$ 133,123.00 <br />Completed <br />300% <br />Jul -18 <br />Build <br />The Work to be performed under this Contract includes, but is not <br />limited to, the following: (1) Installation of nine (9) Biscayne <br />Aquifer recovery wells (RW) at the Site. (2) A minimum of two <br />FPL-PTN CRP Turkey Point Biscayne Aquifer Recovery <br />FPL <br />700 Universe Blvd, luno <br />Mr.c ; Gary A Carstens <br />(,%1)904-3641;(941) <br />Raullebregfplsom' <br />— - <br />4766 SW 344th St. Florida City; Turkey Point Nuclear <br />i 17,413;140.00 <br />recovery wells shall be installed at one time, requiring the use of <br />Completed <br />100% <br />Sep -18 moommo <br />Well system <br />Beach, FL 33408 <br />(Contract Sepcialist) <br />483-2069 <br />Garv.A.Carstens(Afpl.coi,. <br />multiple dsilt rigs. (3) Preparation of a geologk log. (4) Bore hole <br />geophysical logging. (5) Development and testing of each recovery <br />well. (6) Survey of eaeh recovery well site to include top of casing <br />and welk pad. elevation. (7) Site closeout activities. <br />THORNTON CONST Arcola Lakes <br />Thornton <br />1037 NW 81 St $ 126,185.00 <br />Completed <br />100% <br />Aug -18 <br />Project consists of the design of a Cast in place oil water separator <br />FPL -Turkey Point Bay it Turkey Point Oil /Water <br />FPL <br />700 Universe Blvd, Juno <br />Raul Gary Carstens <br />786.243.423; (941) 483- <br />Raul.Febarsten <br />9760 SW 344th St. Florida City $ 2,150,942.00 <br />system within a large retention pond within a environmentally <br />Completed <br />100% <br />Jan -19 <br />Separator &Retention Pit Project <br />Beach, FL 33408 <br />antra <br />(Contract Sepcialist) <br />2069 <br />Garv.A.Carstens@fpl,com <br />@fpl <br />sensitive land area within the FPLTurkey Plant facility. <br />FPL Square Station DuctBank <br />FPL <br />700 Universe Blvd, Juno <br />David Fite; GaryA Carstens <br />305.377.4146;(941)483 <br />David.Fite@fpl.com: <br />1424 NW Miami PI <br />$ 652,000.00 <br />Completed <br />100% <br />Jun -18 <br />Beach, FL 33408 <br />(Contract Sepcialist) <br />2069 <br />Garv.A.Carstens@fulcam <br />TRI CITY ELECTRIC Apotex <br />Apotex <br />15501 SW 29th St, Miramar <br />$ 245,733.00 <br />Completed <br />100% <br />Dec -17 <br />POOLE -5.5 Upgrd Pmp Station <br />Miami Dade <br />3750 NW 181 Miami Gardens <br />$ 145,913.00 <br />Completed <br />100% <br />Dec -21 <br />POOLE &Kent -COGEN Facility <br />Miami Dade <br />David Blanchard (PM) <br />305.325.1930 (P&Koffice) <br />1781 NW North River Drive <br />$ 1,152,707.25 <br />Completed <br />100% <br />May -20 <br />; 786.593.3244 <br />M -FPL -River landing <br />FPL <br />700 Universe Blvd, Juno <br />David Fite; Gary A Carstens <br />305.377.4146; (941) 483 <br />Dayld.Flte9Dfpl.com• <br />1400 NW North River Dr, Miami <br />$ 444,400.00 <br />Completed <br />100% <br />Oct -19 <br />Beach,FL33408 <br />(Contract Sepcialist) <br />2069 <br />Gary.A.Carstens Isom <br />Smith Commercial Contracting - Everglades T-Moblie <br />BCE! <br />Janal Lindner, LEED AP <br />281.444.4332 <br />llindner@smithc.cam <br />NW 103rd Ave & NW 50th St Sunrise <br />$ 1,903,763.55 <br />Project consiste dof Civil portion including earth work, Drainage, <br />water, sewer. Flatwork, signage, and striping.Completed <br />100% <br />Aug -20 <br />FP Duct Bank Work Mult POs <br />FPL 700 Universe Blvd, Juno <br />David Fite; GaryA Carstens <br />305.377.4146; (941) 483 <br />David.Fite f Isom• <br />Miami Dade <br />Multiple PO's <br />Active <br />100% <br />on hold due to developer <br />Beach, FL 33408 <br />(Contract Sepcialist) <br />2069 <br />Garv.A.CarstenslBfpl.com <br />