EXPERIEN E
<br />FERREIRA
<br />D&Z FPL 40CRF112 Containment5tr
<br />FPL
<br />700 Universe Blvd, Juno
<br />David Fite; Gary A Carstens
<br />305.377.4146; (941) 483
<br />David.FiteoDfnl.com:
<br />9760 SW 344th St. Florida City
<br />$ 2,150,942.00
<br />Completed
<br />100%
<br />Feb -19
<br />Beach, FL 33408
<br />(Contract Sepcialist)
<br />2069
<br />Gary.A.Carstensgfel.com
<br />Open, Based on
<br />FPL Emergency/URD Dud Bank FPL
<br />700 Universe Blvd, luno
<br />David Fite; Gary A Carstens
<br />305.377.4146; (941) 483
<br />David.Fite8Pful.com:
<br />Miami Dade
<br />Contract Rate of
<br />Completed
<br />100%
<br />Sep -18
<br />Beach, FL 33408
<br />(Contract Sepcialist)
<br />2069
<br />Gary.A.Carstens9fal.com
<br />1350 South Dixie Highway Coral Gables
<br />-129/MH
<br />Project consiste dof Civil portion including earth work, Drainage,
<br />Balfour Beatty Paseo De LaRiviera
<br />NPI
<br />Christian Smith
<br />321.890.5960
<br />ehristiansmithtpbalfourbeassyus.tom
<br />$ 1,816,305.03
<br />Active
<br />100%
<br />Jun -20
<br />water, sewer. Flatwork, signage, and striping.
<br />Layton Construction- Aventura Hospital & Medical
<br />HCA Hospital
<br />Trip DeMoss
<br />615.957.3504
<br />tdemossAlavionconstruction.com
<br />20900 Biscayne Blvd Aventura
<br />$ 2,086,343.42
<br />Project consiste dof Civil portion including earth work, Drainage,
<br />Completed
<br />100%
<br />Jan -21
<br />Center
<br />water. sewer. Flatwork signage, and striping.
<br />WATERSIDE IMPROVEMENTS; constructed concrete runway
<br />Cruise Terminal E Waterside
<br />Port of Miami
<br />1035 North America Way,
<br />Frank Ramirez
<br />305.347.5508
<br />' �nk.ramirez�miamidade.cov
<br />1015 N American Way, Miami
<br />$ 2,051,296.81
<br />foundations and tie -downs for passenger boarding bridges (PBBs)
<br />Completed
<br />100%
<br />Feb -19
<br />Miami, Florida
<br />and constructed new mooring bollards and hardware for cruise
<br />shins.
<br />Uatelier Hotel
<br />FPL
<br />700 Universe Blvd, Juno
<br />David Fite; Gary A Carstens
<br />305.377.4146;(941)483
<br />David. Fite&f l.com .
<br />6901 Collins Ave, Miami Beach
<br />$ 491,430.00
<br />Completed
<br />100%
<br />Feb -19
<br />Beach, FL 33408
<br />(Contract Sepcialist)
<br />2069
<br />Garv.A.Carstens@fpl.com
<br />}olynn Reynolds; Justin
<br />Project Consists of 19,895 linear feet of 16tiiameter C-900 DR14
<br />FKAA Phase 1152 -17 -IIA
<br />FKAA
<br />3200 Overseas Hwy,
<br />Dae E.I. Assistant
<br />�' (
<br />305.296.2454; 305-295-
<br />jdaceygfkaa.com
<br />0905 from Ocean Reef toward Ke •n
<br />Y Lar i.
<br />$ 4,342;787.58
<br />(Restrained Pipe), 42 @near feet of 12 -inch diameter C-900 DR14
<br />Completed
<br />10095
<br />Sep -19
<br />Marathon, FL 33050
<br />Engineer)
<br />2150
<br />(Restrained Pipe) and 1,808 linear feet of 6 -inch diameter C-900.
<br />Jolynn Reynolds; Justin
<br />Project Consists of 19,790 linear feet of 16 inch diameter C-900
<br />FKAA Phase 1152 -17 -IIB
<br />FFAti
<br />3200 Overseas Hwy,
<br />Dacey, E.I. (Assistant
<br />305.2962454; 305 -295 -
<br />tdaceys'+fkaa.com
<br />0905 from Ocean Reef toward Key Largo
<br />$ 4,419,697.25
<br />DR14 (Unrestrained Pipe) and 2,730 linear feet of 16 inch diameter
<br />Completed
<br />100%
<br />Sep -19
<br />Marathon, FL 33050
<br />Engineer)
<br />2151
<br />C-900 DR14 (Restrained Pipe) 4 master meter taps.
<br />Installation of duds & hangers system on the 1.5 mile bridge being
<br />built on Tamiamj Trail approximately 12 miles west of Krome Ave
<br />(Bridge 1. The road contractor expects to have the bridge built and
<br />700 Universe Blvd, Juno
<br />David Fite; Gary A Carstens
<br />305.377.4146; (941) 483
<br />David.Fiteofpl.com;
<br />SW 8th St., Miami FL
<br />$ 156,200.00
<br />ready for FPL to install the duds & hangers system and splice boxes
<br />Completed
<br />100%
<br />Mar
<br />FPL Duct &Hangar West Bridge UG
<br />FPL
<br />Beach, FL 33408
<br />(Contrail Sepcialist)
<br />2069
<br />Gary.A.CarstensWal.com
<br />by mid-July. He is installing the concrete insert loops and plastic
<br />-19
<br />caps for us. The job design has been completed but there are no
<br />MECA units for this work. The material will be acquired from
<br />NW 195th Street & NW 12th Ave Miami Gdns
<br />Condux thru a PO/Shopping Cart process
<br />FPL County Line Bore -Miami Gardens
<br />FPL
<br />700 Universe Blvd, luno
<br />Hugo Cerna; Gary A
<br />Carstens (Contract
<br />305-299-9264; (941)
<br />Garv.A.Carstens0fnl.com
<br />$ 248,930.00
<br />DIRECTIONAL BORE 4504 OF 1-6" FLEX CONDUIT AND PULL 1000
<br />Completed
<br />100%
<br />Aug -19
<br />Beach, FL 33408
<br />483-2069
<br />—
<br />MCM FROM RISER TO RISER
<br />Se;)cialist,
<br />Over 3 miles of roadway reconstruction, full 4 lane divided with
<br />continuous drainage, street fighting, traffic siignalization, a culvert
<br />FOOT T6442 - NW 47 Ave From NW 199 ST to Premier
<br />1000 N.W. 111 Avenue
<br />John M Garzia ; Mario
<br />786.510.6822 ;
<br />John.Garzia@dot.state.fl.us
<br />NW :7 Ave From NW 199 ST to Premier Parkway and South of NW 203 street to N.
<br />extension, bridge widening and the construction of approximately
<br />Parkway and South of NW 203 street to N. of S. Snake CR
<br />FDOT-f6442
<br />Miami, Flonda 33172
<br />Cabrera
<br />305.216.4962
<br />Mario.Cabrera®dot.state.fl.us
<br />of S. Snake CR Canal
<br />$ 12,892,744.00
<br />2 miles of 16" water main with cross connections and
<br />Completed
<br />10096
<br />May -20
<br />Canal
<br />abandonment of the old main as a joint project with Miami -Dade
<br />Water & Sewer.
<br />FPL -Commodore Bay -Miami
<br />FPL
<br />700 Universe Blvd, Juno
<br />David Fite; Gary A Carstens
<br />305.377.4146; (941) 483
<br />David.Fiteefpl.com:
<br />240 SE 14 St., Miami FL
<br />$ 145,400.00
<br />Completed
<br />100%
<br />Jul -19
<br />Beach, FL 33408
<br />(ContractSepcialist)
<br />2069
<br />Gary.A.Carstens9lfpl.com
<br />122 SW 3rd St., Miami FL
<br />FPL -Central Yard
<br />FPL
<br />700 Universe Blvd, Juno
<br />David Fite; Gary A Carstens
<br />305.377.4146; (941) 483
<br />David.Fite0fpl.com:,
<br />$ 564,616.00
<br />Completed
<br />1009.
<br />Jun -19
<br />Beach, FL 33408
<br />(Contract Sepcialist)
<br />2069
<br />Gary.A.Carstens*fnl.com
<br />Jackson
<br />Skanska Duct Bank
<br />Memorial
<br />Donald Armstrong
<br />1091 NW 19 St. Miami FL
<br />$ 247,703.00
<br />Completed
<br />100%
<br />Sep -19
<br />Hospital
<br />Timberlake 70-5237 (62H) – WR 7366478 (Lots 1-28 & 32.1-33.6)
<br />Ymmar Smith; Gary A
<br />FOR Bore; 2,154 CMH 03,550' FDR bore -12" min distance to other
<br />FPL -Timberlake Bore
<br />FPL
<br />700 Universe Blvd, Juno
<br />Carstens (Contrail
<br />954-4 (941)
<br />Gary.A.Carstenstfti.com
<br />26 NW 80th Ave., Sunrise FL
<br />$ 317,400.00
<br />utilities o 2,220'; 2-6" HDPE conduit (0 spare) –1000A KCMIL cable
<br />Completed
<br />100%
<br />Jun -19
<br />Beach, FL 33408
<br />Sepcialist)
<br />4883-203-205;69
<br />4 36" min cover OCrossing SW 73rd Ave (S/O 5200 SW 73rd Ave)
<br />BCEI
<br />Janal Lindner, LEED AP
<br />281.444.4332
<br />Jlindner@smithc.com
<br />NW 103rd Ave. Sunrise FL 33351
<br />1,330'; 4-6" HDPE conduit I2 spares –1000A KCMIL cable 4
<br />Smith Commercial Contracting - T -Mobile - Nobhill
<br />$ 174,397.00
<br />, .
<br />Project consiste dof Civil portion including earth workDrainage
<br />Completed
<br />100%
<br />May -20
<br />Turning Lane (CHANGE ORDER to Job 4164)
<br />Flatwork, signage, and striping.
<br />I
<br />The project consists of the construction of a stormwater
<br />Islamorada- VENETIAN SHORES STORMWATER
<br />Villaga of
<br />86800 Overseas Hwy
<br />Andrew Engelmeyer
<br />305.481.0543
<br />Islamorada, Village of Islands
<br />$ 1,600,000.00
<br />management system in three (3) streets at Venetian Shores using Completed
<br />100%
<br />Feb -20
<br />MANAGEMENT SYSTEM
<br />Islamorada
<br />Islamorada,FL 33036
<br />exfiltration trenches, solid pipes, HDPE pipes per specifications and
<br />density requirements posted.
<br />
|