Laserfiche WebLink
EXPERIEN E <br />FERREIRA <br />D&Z FPL 40CRF112 Containment5tr <br />FPL <br />700 Universe Blvd, Juno <br />David Fite; Gary A Carstens <br />305.377.4146; (941) 483 <br />David.FiteoDfnl.com: <br />9760 SW 344th St. Florida City <br />$ 2,150,942.00 <br />Completed <br />100% <br />Feb -19 <br />Beach, FL 33408 <br />(Contract Sepcialist) <br />2069 <br />Gary.A.Carstensgfel.com <br />Open, Based on <br />FPL Emergency/URD Dud Bank FPL <br />700 Universe Blvd, luno <br />David Fite; Gary A Carstens <br />305.377.4146; (941) 483 <br />David.Fite8Pful.com: <br />Miami Dade <br />Contract Rate of <br />Completed <br />100% <br />Sep -18 <br />Beach, FL 33408 <br />(Contract Sepcialist) <br />2069 <br />Gary.A.Carstens9fal.com <br />1350 South Dixie Highway Coral Gables <br />-129/MH <br />Project consiste dof Civil portion including earth work, Drainage, <br />Balfour Beatty Paseo De LaRiviera <br />NPI <br />Christian Smith <br />321.890.5960 <br />ehristiansmithtpbalfourbeassyus.tom <br />$ 1,816,305.03 <br />Active <br />100% <br />Jun -20 <br />water, sewer. Flatwork, signage, and striping. <br />Layton Construction- Aventura Hospital & Medical <br />HCA Hospital <br />Trip DeMoss <br />615.957.3504 <br />tdemossAlavionconstruction.com <br />20900 Biscayne Blvd Aventura <br />$ 2,086,343.42 <br />Project consiste dof Civil portion including earth work, Drainage, <br />Completed <br />100% <br />Jan -21 <br />Center <br />water. sewer. Flatwork signage, and striping. <br />WATERSIDE IMPROVEMENTS; constructed concrete runway <br />Cruise Terminal E Waterside <br />Port of Miami <br />1035 North America Way, <br />Frank Ramirez <br />305.347.5508 <br />' �nk.ramirez�miamidade.cov <br />1015 N American Way, Miami <br />$ 2,051,296.81 <br />foundations and tie -downs for passenger boarding bridges (PBBs) <br />Completed <br />100% <br />Feb -19 <br />Miami, Florida <br />and constructed new mooring bollards and hardware for cruise <br />shins. <br />Uatelier Hotel <br />FPL <br />700 Universe Blvd, Juno <br />David Fite; Gary A Carstens <br />305.377.4146;(941)483 <br />David. Fite&f l.com . <br />6901 Collins Ave, Miami Beach <br />$ 491,430.00 <br />Completed <br />100% <br />Feb -19 <br />Beach, FL 33408 <br />(Contract Sepcialist) <br />2069 <br />Garv.A.Carstens@fpl.com <br />}olynn Reynolds; Justin <br />Project Consists of 19,895 linear feet of 16tiiameter C-900 DR14 <br />FKAA Phase 1152 -17 -IIA <br />FKAA <br />3200 Overseas Hwy, <br />Dae E.I. Assistant <br />�' ( <br />305.296.2454; 305-295- <br />jdaceygfkaa.com <br />0905 from Ocean Reef toward Ke •n <br />Y Lar i. <br />$ 4,342;787.58 <br />(Restrained Pipe), 42 @near feet of 12 -inch diameter C-900 DR14 <br />Completed <br />10095 <br />Sep -19 <br />Marathon, FL 33050 <br />Engineer) <br />2150 <br />(Restrained Pipe) and 1,808 linear feet of 6 -inch diameter C-900. <br />Jolynn Reynolds; Justin <br />Project Consists of 19,790 linear feet of 16 inch diameter C-900 <br />FKAA Phase 1152 -17 -IIB <br />FFAti <br />3200 Overseas Hwy, <br />Dacey, E.I. (Assistant <br />305.2962454; 305 -295 - <br />tdaceys'+fkaa.com <br />0905 from Ocean Reef toward Key Largo <br />$ 4,419,697.25 <br />DR14 (Unrestrained Pipe) and 2,730 linear feet of 16 inch diameter <br />Completed <br />100% <br />Sep -19 <br />Marathon, FL 33050 <br />Engineer) <br />2151 <br />C-900 DR14 (Restrained Pipe) 4 master meter taps. <br />Installation of duds & hangers system on the 1.5 mile bridge being <br />built on Tamiamj Trail approximately 12 miles west of Krome Ave <br />(Bridge 1. The road contractor expects to have the bridge built and <br />700 Universe Blvd, Juno <br />David Fite; Gary A Carstens <br />305.377.4146; (941) 483 <br />David.Fiteofpl.com; <br />SW 8th St., Miami FL <br />$ 156,200.00 <br />ready for FPL to install the duds & hangers system and splice boxes <br />Completed <br />100% <br />Mar <br />FPL Duct &Hangar West Bridge UG <br />FPL <br />Beach, FL 33408 <br />(Contrail Sepcialist) <br />2069 <br />Gary.A.CarstensWal.com <br />by mid-July. He is installing the concrete insert loops and plastic <br />-19 <br />caps for us. The job design has been completed but there are no <br />MECA units for this work. The material will be acquired from <br />NW 195th Street & NW 12th Ave Miami Gdns <br />Condux thru a PO/Shopping Cart process <br />FPL County Line Bore -Miami Gardens <br />FPL <br />700 Universe Blvd, luno <br />Hugo Cerna; Gary A <br />Carstens (Contract <br />305-299-9264; (941) <br />Garv.A.Carstens0fnl.com <br />$ 248,930.00 <br />DIRECTIONAL BORE 4504 OF 1-6" FLEX CONDUIT AND PULL 1000 <br />Completed <br />100% <br />Aug -19 <br />Beach, FL 33408 <br />483-2069 <br />— <br />MCM FROM RISER TO RISER <br />Se;)cialist, <br />Over 3 miles of roadway reconstruction, full 4 lane divided with <br />continuous drainage, street fighting, traffic siignalization, a culvert <br />FOOT T6442 - NW 47 Ave From NW 199 ST to Premier <br />1000 N.W. 111 Avenue <br />John M Garzia ; Mario <br />786.510.6822 ; <br />John.Garzia@dot.state.fl.us <br />NW :7 Ave From NW 199 ST to Premier Parkway and South of NW 203 street to N. <br />extension, bridge widening and the construction of approximately <br />Parkway and South of NW 203 street to N. of S. Snake CR <br />FDOT-f6442 <br />Miami, Flonda 33172 <br />Cabrera <br />305.216.4962 <br />Mario.Cabrera®dot.state.fl.us <br />of S. Snake CR Canal <br />$ 12,892,744.00 <br />2 miles of 16" water main with cross connections and <br />Completed <br />10096 <br />May -20 <br />Canal <br />abandonment of the old main as a joint project with Miami -Dade <br />Water & Sewer. <br />FPL -Commodore Bay -Miami <br />FPL <br />700 Universe Blvd, Juno <br />David Fite; Gary A Carstens <br />305.377.4146; (941) 483 <br />David.Fiteefpl.com: <br />240 SE 14 St., Miami FL <br />$ 145,400.00 <br />Completed <br />100% <br />Jul -19 <br />Beach, FL 33408 <br />(ContractSepcialist) <br />2069 <br />Gary.A.Carstens9lfpl.com <br />122 SW 3rd St., Miami FL <br />FPL -Central Yard <br />FPL <br />700 Universe Blvd, Juno <br />David Fite; Gary A Carstens <br />305.377.4146; (941) 483 <br />David.Fite0fpl.com:, <br />$ 564,616.00 <br />Completed <br />1009. <br />Jun -19 <br />Beach, FL 33408 <br />(Contract Sepcialist) <br />2069 <br />Gary.A.Carstens*fnl.com <br />Jackson <br />Skanska Duct Bank <br />Memorial <br />Donald Armstrong <br />1091 NW 19 St. Miami FL <br />$ 247,703.00 <br />Completed <br />100% <br />Sep -19 <br />Hospital <br />Timberlake 70-5237 (62H) – WR 7366478 (Lots 1-28 & 32.1-33.6) <br />Ymmar Smith; Gary A <br />FOR Bore; 2,154 CMH 03,550' FDR bore -12" min distance to other <br />FPL -Timberlake Bore <br />FPL <br />700 Universe Blvd, Juno <br />Carstens (Contrail <br />954-4 (941) <br />Gary.A.Carstenstfti.com <br />26 NW 80th Ave., Sunrise FL <br />$ 317,400.00 <br />utilities o 2,220'; 2-6" HDPE conduit (0 spare) –1000A KCMIL cable <br />Completed <br />100% <br />Jun -19 <br />Beach, FL 33408 <br />Sepcialist) <br />4883-203-205;69 <br />4 36" min cover OCrossing SW 73rd Ave (S/O 5200 SW 73rd Ave) <br />BCEI <br />Janal Lindner, LEED AP <br />281.444.4332 <br />Jlindner@smithc.com <br />NW 103rd Ave. Sunrise FL 33351 <br />1,330'; 4-6" HDPE conduit I2 spares –1000A KCMIL cable 4 <br />Smith Commercial Contracting - T -Mobile - Nobhill <br />$ 174,397.00 <br />, . <br />Project consiste dof Civil portion including earth workDrainage <br />Completed <br />100% <br />May -20 <br />Turning Lane (CHANGE ORDER to Job 4164) <br />Flatwork, signage, and striping. <br />I <br />The project consists of the construction of a stormwater <br />Islamorada- VENETIAN SHORES STORMWATER <br />Villaga of <br />86800 Overseas Hwy <br />Andrew Engelmeyer <br />305.481.0543 <br />Islamorada, Village of Islands <br />$ 1,600,000.00 <br />management system in three (3) streets at Venetian Shores using Completed <br />100% <br />Feb -20 <br />MANAGEMENT SYSTEM <br />Islamorada <br />Islamorada,FL 33036 <br />exfiltration trenches, solid pipes, HDPE pipes per specifications and <br />density requirements posted. <br />