My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Stout Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(21-08-01) Utility Undergrounding Conversion for Golden Shores
>
Responses
>
The Stout Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2021 8:57:38 AM
Creation date
9/28/2021 4:58:48 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Utility Undergrounding
Bid No. (xx-xx-xx)
21-08-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID FORM revised <br />Note: Some pay items are broken down into material and labor costs. The Sum of these two costs determines the total <br />unit costs. Total Unit Cost will be used to determine Base Price. Where material provided by others, material unit costs <br />to not apply. Cost that do not apply are marked "N/A". Cost included in Total Unit Cost are identified as 'INCL". <br />PAYITEM Total Unit Base Price <br />Quantity Unit Labor Unit Material Cost (total unit <br />PER 01020 Cost Unit Cost (labor + cost x <br />material) I quantity) <br />1 <br />Bonds and Insurance <br />1 <br />LS <br />INCL <br />INCL <br />$275,000.00 <br />$275,000.00 <br />2 <br />Mobilization <br />1 <br />LS <br />INCL <br />INCL <br />$275,000.00 <br />$275,000.00 <br />3 <br />Maintenance of Traffic <br />18 <br />MONTHLY <br />INCL <br />INCL <br />$18,000.00 <br />$324,000.00 <br />4 <br />Testing, Surveying and <br />1 <br />LS <br />INCL <br />INCL <br />$70,000.00 <br />$70,000.00 <br />Miscellaneous <br />5 <br />Indemnification Allowance <br />1 <br />LS <br />N/A <br />N/A <br />$100 <br />$100 <br />SUBTOTAL DIVISION 1 <br />Install only one(1)_6 inch PVC <br />schedule 40 conduit bundled in <br />6 <br />one main trench with others for <br />1,374 <br />LF <br />$10.00 <br />N/A <br />$10.00 <br />$13,740.00 <br />FPL Utility (FPL to fumish <br />material) <br />Install only two (2)-6 inch PVC <br />7 <br />schedule 40 conduit bundled in <br />one main trench with others for <br />172 <br />LF <br />$20.00 <br />N/A <br />$20.00 <br />$3,440.00 <br />FPL Utility (FPL to furnish <br />material) <br />Install only three (3)-6 inch PVC <br />schedule 40 conduit bundled in <br />8 <br />one main trench with others for <br />20 <br />LF <br />$30.00 <br />N/A <br />$30.00 <br />$600.00 <br />FPL Utility (FPL to fumish <br />material) <br />Total Unit <br />Base Price <br />Labor Unit <br />Material <br />Cost <br />(total unit <br />Quantity <br />Unit <br />Cost <br />Unit Cost <br />(labor+ <br />cost x <br />' 01020 <br />material <br />quantify <br />Install only one (1)-2 inch PVC <br />schedule 40 conduit bundled in <br />9 <br />one main trench with others for1,085 <br />LF <br />$75.00 <br />NIA <br />$75A0 <br />$81,375.00 <br />FPL Utility (FPL to furnish <br />material) <br />
The URL can be used to link to this page
Your browser does not support the video tag.